13
14.4
If the working time is rather short than it is fully charged, you should consider to charge the
storage battery. Opening the battery box cover, pulling up the positive and negative metal pieces and
removing the storage battery. While changing the battery, be careful to make sure the electrocode of the
storage battery is correct.
14.5
Battery switch (see figure 1-b): if you want to charge the battery or use with DC power, please
turn on the battery. If you don’t want to use it for a long time or in transportation, please turn it off.
14.6
About recharging: there are three colors of recharging light to indicate different meanings, red
means the battery needs continuous recharging, yellow means the voltage is 70% full and green means
the voltage is 100% full.
15.1
Please use the battery correctly according to the instruction in the manual.
15.2
When the load (including tare) being weighed exceeds Max. Capacity plus 9e. (“e” refers to
Division), the indicator displays .
15.3
You can wash down indicator with water, but don’t wash it with high corrosive solvent.
15.4
Be sure that the ground terminal of AC power is properly grownded.
15.5
Don’t disassemble it without authorisation.
15.6
Turn off power supply and pull out its power plug at once if it is out of order in use. Non-
professional personnel can’t repair it without authorisation, contact our sales agent in your area.
15.7
If you need to re-calibrate the indicator, do it after the indicator is warm up for 30 minutes..
15. USE GUIDE
Forbid changing the data of the scale unless permitted by law.
In order to convenient for function’s amendment, indicator is set 3 main directories on the modification
interface. The following are the description of 3 main directories:
F1: Function management
F2: Circumstance factor adjustment
F3: Calibration
16.1
Entering main directories
Under power on state, firstly press (I/O) to turn it off then press (I/O) to turn it on again. During the
indicator is self-checking “7” - “0”, press (I/O) (notice: you must press (I/O) before the self-
inspection is finished), at this time the indicator will display , then press (0) to make it display
.
Under turn-off state, process the operation mentioned above after it warm up for 30 minutes.
When pressing successivly, the indicator will select the main directories in F1-F2-F3-F1 sequence.
When pressing (ENTER), the indicator will enter subdirectory or confirm the selection of the
subdirectory.
When pressing (EXIT) the indicator will back to main directory from subdirectory and return to the self-
checking state.
16.2
Entering subdirectories and selecting
When the indicator displays “F1” or “F2” or “F3”, you can make it enter subdirectories by pressing
(ENTER). And you can choose the subdirectories by pressing .
16. DATA SETTING AND CALIBRATING
I/O
POWER
I/O
POWER
I/O
POWER
I/O
POWER
0
ENTER
T
UNITS
USER’S MANUAL
CWP. Bench scale
UNITS
ENTER
T
C
EXIT
BL
Содержание CWP
Страница 1: ...CWP Bench scale USER S MANUAL...
Страница 19: ...19 USER S MANUAL CWP Bench scale...
Страница 20: ......