
Programming the Pump
79
SIGMA Spectrum Infusion System
Pump Operating Software Version 8.00
Operator’s Manual
For Use With MDL Version 8.0
5. Press
RUN
to begin delivery of the new VTBI.
Delayed Run
If Delayed Run is enabled (per drug in the Drug Library), the start of any programmed infusion may
be delayed up to 12 hours.
To set up a delayed run:
1. On the Infusion Setup screen, enter any value between 1 minute and 12 hours (00:01 to
12:00, hr:min) for the delay run parameter and press
OK
.
2. After the infusion programming is complete and the set is loaded, press
RUN
to begin the
infusion delay timer. The delay running screen is displayed with the remaining delay time
shown in a flashing format.
3. When the delay time period expires, the Pump begins delivery of the programmed infusion.
Primary Check Flow will display.
4. An inactivity alarm will occur after 2 minutes and Primary Check Flow confirmation will be
required.
To stop or cancel the delay timer:
While the delay timer is running, it can be stopped or cancelled.
Figure 79. VTBI Review Screens.
Содержание 35700BAX2
Страница 152: ...146 Appendix B Flow Rate Accuracy Manual 41018v0800 SIGMA Spectrum Infusion System Revision B Operator s Manual ...
Страница 154: ...148 Appendix B Flow Rate Accuracy Manual 41018v0800 SIGMA Spectrum Infusion System Revision B Operator s Manual ...
Страница 176: ...170 Glossary Manual 41018v0800 SIGMA Spectrum Infusion System Revision B Operator s Manual ...