12 Decommissioning
12.1 Decommissioning procedure
If you need to decommission the SH DB system, either temporarily or
permanently, proceed as follows:
1. Switch off the power supply to the system.
2. Wait until the fluid has drained out of the installation and is stored in
the SH DB system.
3. Close all the valves on the system.
4. Drain the system.
Fig.47
Switching off the power supply
MW-0000149-1
12 Decommissioning
7729335 - 04 - 12052021
Solar hydraulic unit
41
Содержание SH 14
Страница 44: ...7729335 04 12052021 7729335 04 ...