7219717 - 02 (08/15)
EcoBlue Heat
5
Contents
5.3.9
Flue/Chimney Trim
5.3.10
Terminal Guard
5.3.11
Flue/Chimney Deflector
5.3.12
Flue/Chimney Accessories
5.4
Unpacking & Initial Preparation
5.4.1
Unpacking
5.4.2
Initial Preparation
5.4.3
Making the Water Connection
5.4.4
Filling the Condensate Trap
5.4.5
Connecting the Condensate Drain
5.4.6
Connecting the Gas Supply
6
Installation
6.1
Air Supply / Flue Gas Connections
6.1.1
Connecting the Top Flue
6.2
Electrical Connections
6.2.1
Electrical Connections of the Appliance
6.2.2
Connecting External Devices
6.3
Filling the System
6.4
Completing the Installation
6.4.1
Completion
7
Commissioning
7.1
General
7.2
Checklist before Commissioning
7.2.1
Preliminary Electrical Checks
7.2.2
Checks
7.3
Commissioning Procedure
7.4
Gas Settings
7.4.1
‘Chimney Sweep’ Mode
7.4.2
‘Chimney Sweep’ Mode - Combustion Check
7.5
Configuring the System
7.5.1
Check the Operational (Working) Gas Inlet Pressure & Gas Rate
7.6
Final Instructions
8
Operation
8.1
General
8.2
Start-Up
8.3
Shutdown
8.4
Use of the Control Panel
8.5
Frost Protection
9
Settings
9.1
Parameters
34
34
34
34
35
35
35
36
36
36
36
37
37
37
39
39
39
40
40
40
41
41
41
41
41
41
42
42
43
44
44
45
46
46
46
46
46
46
46
46