38
EcoBlue Heat
7219717 - 02 (08/15)
6
Installation
10. Lift the boiler and locate the slots in the wall bracket over
the horizontal tongues on the wall bracket. As the boiler is
pushed back the wall bracket spring latch will positively engage
over the wall mounted bracket (Figs. AA, BB & CC).
11. Locate the slots in the safety bracket over the two vertical
tongues on the wall bracket and secure with the two screws
(Fig CC).
12. Insert the flue through the hole in the wall. Fit the elbow to
the boiler adaptor, ensuring that it is pushed fully in (Fig. 29).
13. Draw the flue back through the wall and engage it in the
elbow. It may be necessary to lubricate to ease assembly of the
elbow and flue (Fig. 30).
14. Ensure that the terminal is positioned with the slots to the
bottom (Fig. 31). Secure the flue to the elbow with the screws
supplied (Fig. 30).
It is essential that the flue terminal is fitted as shown to
ensure correct boiler operation and prevent water
entering the flue. There must be no part of the air duct
(white tube) visible outside the property after
installation.
15. Make good between the wall and air duct outside the
building, appropriate to the wall construction and fire rating.
16. If necessary fit a terminal guard (see Section 5.3.10).
If not already done so, make the water connections, fill
the condensate trap, connect the condensate drain and connect
the gas supply as described in Sections 5.4.3, 5.4.4, 5.4.5 &
5.4.6 respectively.
Slots at bottom
Fig. 30
Fig. 31
Adaptor
Apply the lubricant
supplied for ease of
assembly (do not
use any other type).
Ensure Elbow is
fully engaged into
Boiler Adaptor
Fig. 29
Boiler Elbow
Apply the lubricant
supplied for ease of
assembly (do not use
any other type).
Ensure Flue is fully
engaged into Elbow
Spring Latch
Horizontal
Tongue
Safety
Bracket
Fig. AA
Fig. BB
Fig. CC
Screw