5 Before installation
34
5.6
Unpacking & initial preparation
5.6.1
Unpacking
Caution
RISK ASSESSMENT - Before commencing the installation it is
recommended that the "Five Steps to Risk Assessment" docu
ment published by the HSE is consulted, and an assessment per
formed as described. GAS SUPPLY - The gas supply, gas type
and pressure must be checked for suitability before connection.
See
Handling, page 9 before unpacking or lifting the boiler.
To unpack the boiler:
1. Remove the banding and the cardboard sleeve.
2. Remove the polystyrene top piece and installation kit.
3. Snap off the rear part of the polystyrene bottom piece.
Important
Polystyrene base should be removed completely if fitting the boiler
into a space with minimum side clearances of 5 mm each side.
Important
If removing the polystyrene base, the sealing caps can also be re
moved at this stage. Care must be taken to avoid damage from
any residual water in the boiler.
Fig.26 Unpacking the boiler
BO-0000071
5
1
2
3
4
LIFT
10
6
7
8
9
b
a
LIFT
Combi 2