![Baxi Combi 200 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/baxi/combi-200/combi-200_installation-and-service-manual_2711716037.webp)
Fig.26
Unpacking
5
1
2
3
4
6
7
8
PN-0000513
5.5.2
Initial preparation
1. After considering the location position the fixing template on the wall
ensuring it is level both horizontally and vertically.
2. Mark the position of the fixing slots for the wall bracket indicated on
the template.
3. Mark the position of the centre of the flue hole (rear exit). For side flue
exit, mark as shown.
4. If required, mark the position of the gas and water pipes. Remove the
template.
5. Cut the hole for the flue (minimum diameter 116mm).
6. Drill the wall as previously marked to accept suitable wall plugs.
Secure the wall bracket using appropriate fixing screws.
Fig.27
Template
Ø 8
34
33.5
65
65
65
65
67.5
198
198
50
M
IN
82.5
3
2
116 Dia Minimum
Aperture For
Flue Tube
Vertical Flue
Centre Line
Ø 22
Heating
Return
(22mm)
Heating
Flow
(22mm)
Hot Water
Outlet
(15mm)
Combi Only
Not System
Cold Water
Inlet
(15mm)
Combi Only
Not System
Side Clearance 5
Side Clearance 5
Clearance below 250
Clearance above 183
Wall
View from under boiler
PN-0000514
5 Before installation
7696317 - 1 - 21032018
37
Содержание Combi 200
Страница 81: ...14 Appendix 7696317 1 21032018 81...
Страница 82: ...14 Appendix 82 7696317 1 21032018...