5.4
Transport
This product should be lifted and handled by two people. When lifting
always keep your back straight and wear protective equipment where
necessary. Carrying and lifting equipment should be used as required. e.g.
when install in a loft.
5.5
Unpacking & initial preparation
5.5.1
Unpacking
Important
RISK ASSESSMENT - Before commencing the installation it is
recommended that the "Five Steps to Risk Assessment"
document published by the HSE is consulted, and an assessment
performed as described. GAS SUPPLY - The gas supply, gas type
and pressure must be checked for suitability before connection.
See
Handling, page 9 before unpacking or lifting the boiler.
Follow the procedure on the carton or see the diagrams below to unpack
the boiler.
Lift the boiler to a vertical position (1).
Remove the straps and the strip of tape (2)-(3)-(4).
Remove the accessories (5).
Remove the polystyrene by slipping it off upwards (6).
Remove the carton by pulling it upwards (7).
Snap off the rear part of the polystyrene at the bottom (8).
Important
Polystyrene base should be removed completely if fitting the boiler
into a space with minimum side clearances of 5mm each side.
If removing the polystyrene base the sealing caps can also be removed at
this stage.
Important
Care must be taken to avoid damage from any residual water in
the boiler
5 Before installation
36
7696317 - 1 - 21032018
Содержание Combi 200
Страница 81: ...14 Appendix 7696317 1 21032018 81...
Страница 82: ...14 Appendix 82 7696317 1 21032018...