![Baxi CBP Matic 18 Скачать руководство пользователя страница 218](http://html.mh-extra.com/html/baxi/cbp-matic-18/cbp-matic-18_manual_2711698218.webp)
55
Figura 38 – Replacing the upper lids
Installing the storage unit on the left side of the boiler
The storage unit is set up by default to te installed on the right side of
the boiler. If you wish to install it on the left side, please follow these
steps.
1 – First, remove the upper lids by loosening and removing the two
retaining screws on the rear (Figura 39-a). Then, open the front lid and
remove the 3 scres (Figura 39-c) that hold the lids in place.
Содержание CBP Matic 18
Страница 14: ...11 Mín 2 m T Inspección a Min 4 m Min 1 m Máx 3 m Máx 2 m Incl 3 5 120 mm b ...
Страница 77: ...74 13 Esquemas eléctricos de la caldera de pellets Figura 65 Esquema eléctrico de la placa electrónica ...
Страница 78: ...75 Figura 66 Esquema eléctrico de la placa eléctrica del silo externo ...
Страница 151: ...67 Figura 58 Retirar os parafusos do extractor e aspirar a zona de passagem do ar ...
Страница 158: ...74 13 Esquemas eléctricos da Caldeira a pellets Figura 65 Esquema eléctrico placa electrónica ...
Страница 159: ...75 Figura 66 Esquema eléctrico placa eléctrica do silo externo ...
Страница 160: ...76 a b Figura 67 Sensores de nivel de pellets ...
Страница 231: ...68 c b c d e f ...
Страница 240: ...77 17 Electrical diagram of the pellet run boiler Figure 67 Electrical diagram of the circuit board ...
Страница 241: ...78 Figure 68 Electrical diagram of the external silo s circuit board ...
Страница 245: ...82 ...
Страница 246: ...83 ...
Страница 247: ...84 ...
Страница 248: ......
Страница 249: ...86 BAXI Tel 34 902 89 80 00 www baxi es informacion baxi es ...