![Baxi CBP Matic 18 Скачать руководство пользователя страница 212](http://html.mh-extra.com/html/baxi/cbp-matic-18/cbp-matic-18_manual_2711698212.webp)
49
a)
b)
Figure 29
– Installing the sensor level in the storage unit
2
– Then, you should install the ramp to drop the pellets in the boiler’s internal tank.
For this, you should start by removing the right side cov
er of the boiler’s tank –
removing the 4 screw securing it (Figura 30).
Figure 30
– Removing the lateral cover of the boiler’s tank
3
– To assemble the ramp to drop the pellets you should insert it in the tank, as
shown in the following pictures, and fasten it with the screws previously removed.
a)
b)
Содержание CBP Matic 18
Страница 14: ...11 Mín 2 m T Inspección a Min 4 m Min 1 m Máx 3 m Máx 2 m Incl 3 5 120 mm b ...
Страница 77: ...74 13 Esquemas eléctricos de la caldera de pellets Figura 65 Esquema eléctrico de la placa electrónica ...
Страница 78: ...75 Figura 66 Esquema eléctrico de la placa eléctrica del silo externo ...
Страница 151: ...67 Figura 58 Retirar os parafusos do extractor e aspirar a zona de passagem do ar ...
Страница 158: ...74 13 Esquemas eléctricos da Caldeira a pellets Figura 65 Esquema eléctrico placa electrónica ...
Страница 159: ...75 Figura 66 Esquema eléctrico placa eléctrica do silo externo ...
Страница 160: ...76 a b Figura 67 Sensores de nivel de pellets ...
Страница 231: ...68 c b c d e f ...
Страница 240: ...77 17 Electrical diagram of the pellet run boiler Figure 67 Electrical diagram of the circuit board ...
Страница 241: ...78 Figure 68 Electrical diagram of the external silo s circuit board ...
Страница 245: ...82 ...
Страница 246: ...83 ...
Страница 247: ...84 ...
Страница 248: ......
Страница 249: ...86 BAXI Tel 34 902 89 80 00 www baxi es informacion baxi es ...