![Baxi CBP Matic 18 Скачать руководство пользователя страница 213](http://html.mh-extra.com/html/baxi/cbp-matic-18/cbp-matic-18_manual_2711698213.webp)
50
c)
d)
Figure 31
– Assembly of the ramp to drop the pellets in the boiler’s tank
4
– Before proceeding with the assembly of the storage unit, you should check if the
worm drive channel is properly docked in its base. To do this, open the lid of the
storage unit and check if the docking is in accordance with Figura 32-a. Also, check if
the pellet’s output tube is in line with the opening of the storage unit (Figura 32-b).
a)
b)
Figure 32 – Worm drive channel for storage unit installation on the right side
5
– Place the flexible hose on the storage unit’s pellet output tube and attach it using
the metal bracket provided. The flexible hose must make a downward curve (Figura
33-c).
Содержание CBP Matic 18
Страница 14: ...11 Mín 2 m T Inspección a Min 4 m Min 1 m Máx 3 m Máx 2 m Incl 3 5 120 mm b ...
Страница 77: ...74 13 Esquemas eléctricos de la caldera de pellets Figura 65 Esquema eléctrico de la placa electrónica ...
Страница 78: ...75 Figura 66 Esquema eléctrico de la placa eléctrica del silo externo ...
Страница 151: ...67 Figura 58 Retirar os parafusos do extractor e aspirar a zona de passagem do ar ...
Страница 158: ...74 13 Esquemas eléctricos da Caldeira a pellets Figura 65 Esquema eléctrico placa electrónica ...
Страница 159: ...75 Figura 66 Esquema eléctrico placa eléctrica do silo externo ...
Страница 160: ...76 a b Figura 67 Sensores de nivel de pellets ...
Страница 231: ...68 c b c d e f ...
Страница 240: ...77 17 Electrical diagram of the pellet run boiler Figure 67 Electrical diagram of the circuit board ...
Страница 241: ...78 Figure 68 Electrical diagram of the external silo s circuit board ...
Страница 245: ...82 ...
Страница 246: ...83 ...
Страница 247: ...84 ...
Страница 248: ......
Страница 249: ...86 BAXI Tel 34 902 89 80 00 www baxi es informacion baxi es ...