3.1
Installation requirements
The minimum distance required between the pellet-run boiler and any highly
flammable surfaces is found specified in 4.
The top of the boiler must be at a distance of at least 100 cms from the ceiling,
especially in rooms with ceilings composed of flammable materials.
The base supporting the boiler cannot be of flammable material. As such, adequate
protection should always be used.
a)
b)
Figure 4
– Minimum distances from all surfaces: a) upper view of the unit's
installation; b) side view of the unit's installation
Warning!
Keep combustible and flammable materials at a safe distance.
Содержание CBP Matic 18
Страница 14: ...11 Mín 2 m T Inspección a Min 4 m Min 1 m Máx 3 m Máx 2 m Incl 3 5 120 mm b ...
Страница 77: ...74 13 Esquemas eléctricos de la caldera de pellets Figura 65 Esquema eléctrico de la placa electrónica ...
Страница 78: ...75 Figura 66 Esquema eléctrico de la placa eléctrica del silo externo ...
Страница 151: ...67 Figura 58 Retirar os parafusos do extractor e aspirar a zona de passagem do ar ...
Страница 158: ...74 13 Esquemas eléctricos da Caldeira a pellets Figura 65 Esquema eléctrico placa electrónica ...
Страница 159: ...75 Figura 66 Esquema eléctrico placa eléctrica do silo externo ...
Страница 160: ...76 a b Figura 67 Sensores de nivel de pellets ...
Страница 231: ...68 c b c d e f ...
Страница 240: ...77 17 Electrical diagram of the pellet run boiler Figure 67 Electrical diagram of the circuit board ...
Страница 241: ...78 Figure 68 Electrical diagram of the external silo s circuit board ...
Страница 245: ...82 ...
Страница 246: ...83 ...
Страница 247: ...84 ...
Страница 248: ......
Страница 249: ...86 BAXI Tel 34 902 89 80 00 www baxi es informacion baxi es ...