background image

Sailing Yacht Bavaria 49 

 

Bavaria Yachtbau GmbH 

(39) 

– 18 –

 

 

 

Einfüllstutzen Deck 

Plate (inlet) 

Tankentlüftung 

Tank venting 

Boiler 

Water heater 

Rücklauf Boiler 

Reflux water heater 

Druckgefäß + Druckschalter 

Accumulator tank + pressure switch 

Spüle 

Sink 

Frischwasserpumpe  

Fresh water pump 

2 – Wegehahn 

2 – way valve  

Waschbecken  

Washbasin 

10 

Tankentlüftung  

Tank venting 

11 

Einfüllstutzen  

Plate (inlet) 

12 

Spüle 

Sink 

13 

Motorkreislauf 

Engine circular 

14 

Waschbecken 

Washbasin 

15 

Entleerung Boiler 

Evacuation water heater 

16 

Cockpitdusche 

Shower 

 

 

 

Note 

 
Exchange the water in tank from time to time. 
Additionally you should use common purifiers. 
 

 

Содержание Bavaria 49

Страница 1: ...Manual for owners and skippers Sailing yacht BAVARIA 49 Bavaria Yachtbau GmbH Bavariastr 1 D 97232 Giebelstadt Tel 49 0 9334 942 0 Fax 49 0 9334 942 116 e mail info bavaria yachtbau com...

Страница 2: ...3 Steering gear 2 3 1 Description of the system 2 3 2 Rudder blade and rudder bearing 2 4 Bilge pump bilge lines 2 4 1 Description of the pumping arrangement 2 5 Electric installation 2 5 1 AC install...

Страница 3: ...of supply depends on the order the equipment of your yacht can deviate with some descriptions and illustrations In order to be able to adapt our yachts to the constantly progressing technical standar...

Страница 4: ...s of 4m and above and vessels largely self sufficient Certification For yachts with a length of more than 12m hull length the EC Directive intends the certification module B EC type examination in com...

Страница 5: ...s the code number of the certifying body in this case the IMCI International Marine Certification Institute Brussels see Declaration of Conformity Warnings Many chapters of this manual will support a...

Страница 6: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 7...

Страница 7: ...tion 230 V 110 V option AC installation shore connection option safety contact plug box meeting the CEE norm 230 V 110 V battery charger 230 V AC 12 V DC with 27 A or 48 A max current option 12 V DC s...

Страница 8: ...avaria 49 Bavaria Yachtbau GmbH 39 10 1 2 General arrangement 1 2 1 Rigging plan Reference The valid measuring of the foresail reefing gear are on the enclosure note at the carton of the Furlex foresa...

Страница 9: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 11 1 2 2 Deck arrangement...

Страница 10: ...op g track Schienenendst ck mit Umlenkblock 28 Embouts de rail gv Endstops mainsheet track Schienenendkappe 29 Winchs 40 ast Winch Winsch 30 Stoppeur Stopper Stopper 31 Winchs Winch Fallwinde 32 Aerat...

Страница 11: ...zimmer Bathroom 11 Schrank Shelf 12 H ngeschrank Hanging locker 13 Doppelbett Double berth 14 Ankerkasten Chain locker 15 B cherschapp Book locker 16 B cherschapp Book locker 17 Sitz Seat 18 Schrank S...

Страница 12: ...genbett Bunkbed 11 Schrank Shelf 12 Badezimmer WC Bathroom WC 13 Doppelbett Double berth 14 Ankerkasten Chain locker 15 B cherschapp Book locker 16 B cherschapp Book locker 17 Schrank Shelf 18 Etagenb...

Страница 13: ...e mast Option Main halyard Spinnaker halyard attached Genoa halyard Spinnaker uphaul Boom lift Spinnaker downhaul 3 additional weighing lines Additionally we draw your attention to the enclosed trim i...

Страница 14: ...aterlock 4 Kraftstoffzulauf Engine Fuel Intake 5 Kraftstoffr ckf hrung Feed back Fuel 6 Kraftstoffeinf llstutzen Fuel Tank filling Hose 7 Tankentl fter Fuel Tank Ventilator 8 Kraftstofffilter Fuel Fil...

Страница 15: ...ressure pump is done by cutting off all ducts All pipes hoses should be checked for leaks if the pump continuous working though all ducts were cut off properly The pump is protected by a filter which...

Страница 16: ...nk pressure switch 6 Sp le Sink 7 Frischwasserpumpe Fresh water pump 8 2 Wegehahn 2 way valve 9 Waschbecken Washbasin 10 Tankentl ftung Tank venting 11 Einf llstutzen Plate inlet 12 Sp le Sink 13 Moto...

Страница 17: ...et drain valve 6 F kalientank Waste water tank 7 Kugelhahn Eingang WC Toilet Water drain valve 8 Kugelhahn Ausgang F kalientank Waste water drain valve 9 El Duschpumpe El Shower pump 10 El Lenzpumpe E...

Страница 18: ...drain valve 15 Kugelhahn Eingang WC Toilet Water drain valve 16 Kugelhahn Ausgang WC Toilet drain valve 17 Kugelhahn Ausgang Waschbecken Basin drain valve 18 Handlenzpumpe Operated bilge pump 2 2 Tank...

Страница 19: ...aminated into the blade The post runs in two easy going and special rudder bearings The rudder is fixed by a mounting clip at the upper end of the post that also serves for the keeping of the rudder t...

Страница 20: ...drain wells are situated at the rear and lowest part of the cockpit and are led outboard through the transom with hoses 2 4 1 Description of the pumping arrangement The yacht is equipped with both a m...

Страница 21: ...ion of additional electric devices There are only automatic fuses used So you only have to press them in case of a breakdown If a fuse blows repeatedly you should spot the cause or consult a specialis...

Страница 22: ...unction of navigation lights Have spare lamps for all navigation lights aboard Attention the electric wiring of the yacht and or corresponding wiring plans must not be changed Service and maintenance...

Страница 23: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 25 2 5 6 Distribution of electric devices 3 cabin...

Страница 24: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 26 5 cabin...

Страница 25: ...h Bordstromkreis Batterie 140 Ah 16 Battery charger Batterieladeger t 17 Electric panel Elektro Panel 18 Main switch Batterie Hauptschalter 19 Auto pilot optional Autopilot 20 Electronic Compass Elekt...

Страница 26: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 28 2 5 7 Wiring plans...

Страница 27: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 29 2 5 8 Distribution plans...

Страница 28: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 30 2 5 9 AC distribution...

Страница 29: ...e been installed according to the German safety regulations The best by date for the soft connection hoses between the gas cylinder and the copper pipe and between copper pipe and stove is printed ont...

Страница 30: ...all valves and have the installation repaired by a specialist before further use Since the flames consume oxygen a proper airing and deaeration is necessary Do not use the stove for heating the cabin...

Страница 31: ...e retarding cloth which is made of glass cloth and is very useful in the case of fire caused by overheat fat It is the yacht owner s duty to have all fire extinguishers regularly checked and maintaine...

Страница 32: ...s recommendable to have a stern anchor as well as sufficient mooring and towing lines with the necessary strength on board E g 1 stern folding anchor 4 fluke grapnel anchor 12 kg hot galvanised fixed...

Страница 33: ...low the temperature sensor in the exhaust gas hose will release an visual and acoustic warning In this event you should stop and switch off the engine immediately until the problem has been settled se...

Страница 34: ...valves a transverse lever direction indicates CLOSED And a longitudinal direction means OPEN Board ducts 3 cabin 1 K hlwasserfilter Cooling water strainer 2 Ausgang el Duschpumpe El Shower drain pump...

Страница 35: ...aste water drain 6 Echolot Depth sounder 7 Ausgang WC Toilet drain 8 Eingang WC Toilet water drain 9 Ausgang Waschbecken Basin drain 10 Geschwindigkeitsmesser Speedometer 11 Ausgang Sp le Sink drain 1...

Страница 36: ...reduces the engine sound considerably Additionally rubber bearings elastic couplings and the engine room insulation minimise sound emissions Nevertheless you should not turn up the engine too quickly...

Страница 37: ...t dry properly where they come into contact with the caulking material leaving the surface tacky In time most paints will flake away along the line of the joint This spoils the appearance of the teak...

Страница 38: ...one manufacturer that goes on well together 4 3 Wearing and spare parts As an experienced skipper you will not have difficulties in getting original spare parts If you need any help please contact the...

Страница 39: ...ry Empty all cooling water of the engine and follow the instructions of the manufacturer Slacken all belts lighting engine and other engine driven devices Winter storage Observe all notes in the engin...

Страница 40: ...a skipper to introduce his crew into their operation Those being prepared for an emergency are normally never involved But just in case the yacht is properly equipped for those situations with suitab...

Страница 41: ...f conformity engine assurance board with corresponding instruction gas test document with corresponding working instruction release checklist leaflets and description of production work working instru...

Отзывы: