Sailing Yacht Bavaria 49
Bavaria Yachtbau GmbH
(39)
– 19 –
2.1.2 Sea-water circulation
Sea-water is necessary for both WC flushing and engine cooling (see: 2.9).
2.1.3 WC –installation: see enclosed directions for use
Attention
If you are not aboard for a longer time you should
close all sea-valves.
Components: WC-flushing (3 cabin)
1
Borddurchlass
Outlet
2
Fäkalientankentlüftung
Waste water tank venting
3
Kugelhahn Ausgang el. Duschpumpe
El. Shower drain valve
4
Kugelhahn Ausgang Waschbecken
Wash basin drain valve
5
Kugelhahn Ausgang WC
Toilet drain valve
6
Fäkalientank
Waste water tank
7
Kugelhahn Eingang WC
Toilet Water drain valve
8
Kugelhahn Ausgang Fäkalientank
Waste water drain valve
9
El. Duschpumpe
El. Shower pump
10
El. Lenzpumpe
El. Bilge pump
11
Kugelhahn Ausgang el. Duschpumpe
El. Shower drain valve
12
El. Duschpumpe
El. Shower pump
13
Kugelhahn Ausgang Waschbecken
Wash basin drain valve
14
Kugelhahn Ausgang WC
Toilet drain valve
15
Kugelhahn Ausgang Waschbecken
Wash basin drain valve
16
Kugelhahn Eingang WC
Toilet Water drain valve
17
Kugelhahn Ausgang Spüle
Sink drain valve
18
Kugelhahn Eingang WC
Toilet Water drain valve
19
Kugelhahn Ausgang WC
Toilet drain valve
20
Kugelhahn Ausgang Waschbecken
Basin drain valve
21
Handlenzpumpe
Operated bilge pump
Содержание Bavaria 49
Страница 6: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 7...
Страница 9: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 11 1 2 2 Deck arrangement...
Страница 23: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 25 2 5 6 Distribution of electric devices 3 cabin...
Страница 24: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 26 5 cabin...
Страница 26: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 28 2 5 7 Wiring plans...
Страница 27: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 29 2 5 8 Distribution plans...
Страница 28: ...Sailing Yacht Bavaria 49 Bavaria Yachtbau GmbH 39 30 2 5 9 AC distribution...