Commissioning
Mono Power Unit BUM 62, 63, 64
55
Baumüller Nürnberg GmbH
5.94005.12
6.4
Operation
The controller operates the unit (see controller’s manual).
Errors of the motor-end power unit can be resetted by the controller.
Reset of operational faults reported by the supply unit
y
Set the reset input at plug X99AB
y
Switch off the +24 V power supply
The reset signal effects on the supply unit only, the stored faults in the motor-end power unit are not in-
fluenced.
Settings do not have to be made for the units BUM 62, 63, 64.
Содержание BUM 62
Страница 1: ...E 5 94005 12 Manual Mono Power Unit BUM 62 63 64 ...
Страница 8: ...Safety Notes 8 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 10: ...Technical Data 10 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 2 1 2 Block diagram BUM 62 ...
Страница 14: ...Technical Data 14 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 2 3 Type code ...
Страница 16: ...Transportation Unpacking 16 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 28: ...Installation 28 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 40: ...Installation 40 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 5 5 2 Terminal diagram BUM 63 ...
Страница 41: ...Installation Mono Power Unit BUM 62 63 64 41 Baumüller Nürnberg GmbH 5 94005 12 5 5 3 Terminal diagram BUM 64 ...
Страница 62: ...Commissioning 62 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 66: ...Maintenance 66 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 73: ......