Installation
Mono Power Unit BUM 62, 63, 64
45
Baumüller Nürnberg GmbH
5.94005.12
y
ZK+, ZK-
DC link of further units if the total power of the input rectifier is not exceeded.
(max. 36 kW, see Technical Data, input rectifier).
If UL508C has to be observed:
Nominal tightening torque of the terminal screws: 4 Nm resp. 35,4
pound-inches.
y
1C1, 1D1
DC link of further units e.g. ballast.
If UL508C has to be observed:
Use 60°C / 75° C copper conductors only (UL508C, Nov 27, 1996,
Tab. 39.2). Nominal tightening torque of the terminal screws: 6 Nm resp. 53,1 pound-inches.
BUM 63:
M 8 terminals
BUM 64:
M 10 terminals
Содержание BUM 62
Страница 1: ...E 5 94005 12 Manual Mono Power Unit BUM 62 63 64 ...
Страница 8: ...Safety Notes 8 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 10: ...Technical Data 10 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 2 1 2 Block diagram BUM 62 ...
Страница 14: ...Technical Data 14 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 2 3 Type code ...
Страница 16: ...Transportation Unpacking 16 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 28: ...Installation 28 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 40: ...Installation 40 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH 5 5 2 Terminal diagram BUM 63 ...
Страница 41: ...Installation Mono Power Unit BUM 62 63 64 41 Baumüller Nürnberg GmbH 5 94005 12 5 5 3 Terminal diagram BUM 64 ...
Страница 62: ...Commissioning 62 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 66: ...Maintenance 66 Mono Power Unit BUM 62 63 64 5 94005 12 Baumüller Nürnberg GmbH ...
Страница 73: ......