6
|
Electrical installation
Baumer
22
Operating Manual
OM20/OM30 IO-Link | V2
6
Electrical installation
6.1
Pin assignment
4
0 V
3
analog
2
1
+Vs
teach in
1
2
4
3
1
+Vs
2
analog
3
0 V
4
output / IO-Link
6.2
Connection diagram
+Vs
BU (3)
BN (1)
BK (4)
0 V
Z
output / IO-Link
WH (2)
Analog
Push-Pull
analog
Z
Z
1
BN – Brown
2
WH – White
3
BU – Blue
4
BK – Black
6.3
Connecting the sensor to electricity
Instruction:
a) Ensure that the system is disconnected from power.
b) Connect the sensor according to the pin assignment.