RIGGING / DE-RIGGING
BG 25 / 2011 /
2254_BG25_en_0000498763_V01
7 - 10
7.5.3
Installing the Ropes
7.5.3.1 Installing the Main and Auxiliary Ropes
WARNING!
Accident risk!
Ropes breaking can cause serious accidents.
A main rope which has been reeved through a rope crossbeam during
operation and has not been marked out with a swivel is only permitted for
operating mode.
Kelly operation is no longer permitted with this main rope.
The main (4) and the auxiliary (3) rope must be installed while the mast is down.
Select the "winch rigging" mode.
Remove rope guard pins (1) from the masthead.
Select the main winch or the auxiliary winch.
With the left control lever, unwind a sufficient length of rope from the selected winch.
Pass ropes over guide sheaves (5) and unwind until rope ends are at contactor
weights (6).
Thread ropes through contactor weights (6) of hoist limit switches (7).
Reinstall the rope guard pins and secure (1).
Unwind until rope ends are at resting on the machine.
CAUTION
Risk of damaging components!
Check contactor weights are properly attached.