MAINTENANCE
BG 25 / 2011 /
2254_BG25_en_0000498763_V01
9 - 47
9.12 CENTRAL LUBRICATION SYSTEM MAINTENANCE *
The grease receptacle contains 2 kg of normal commercial grease of class NGLI-Kill. 2
and must be topped up with a grease gun (if possible pneumatically) every 50 operating
hours or weekly.
You may take further details to the central lubrication system from the enclosed docu-
mentation.
NOTE
Greases with proportions of solids like graphite or copper pastes may
not be used.
To prevent soilings from getting in the grease, and leading to obstruc-
tions, the grease must be pressed via the lube nipples on the con-
tainer (do not unscrew the lid).
The grease should be topped up until max. 2 cm below the upper
edge, otherwise the ventilation system will be smeared with grease.
*) Not used in this version