4-1
SECTION 4
INSTALLATION
GENERAL
When not shipped as part of a control or switchgear panel, BE1-DFPR relays are shipped in a sturdy carton
to prevent damage during transit. Immediately upon receipt, check the model and style number against the
requisition and packing list to see that they agree. Visually inspect for damage that may have occurred
during shipment. If there is evident damage, immediately file a claim with the carrier and contact a sales
representative at Basler Electric, Highland, Illinois.
In the event the unit is not to be installed immediately, store it in its original shipping carton in a moisture and
dust free environment. It is strongly recommended that an operational test (refer to Section 5) always be
performed prior to installation.
OPERATING PRECAUTIONS
Before installation or operation, observe the following precautions.
1.
Always be sure that external operating (monitored) conditions are stable before removing a BE1-DFPR
unit for inspection, testing, or servicing.
2.
BE1-DFPR relays are solid-state devices and have been type tested in accordance with the
requirements defined in the following paragraph, Dielectric Test. If a wiring insulation test is required
on your switchgear or panel assembly and this relay is to be tested, observe the information noted in
the following paragraph, Dielectric Test.
3.
Be sure that the BE1-DFPR chassis is hard wired to earth ground using the chassis ground (terminal
25) on the rear of the unit.
4.
When the unit is in service, the controls should be protected by the cover supplied. This limits access
to the control settings.
DIELECTRIC TEST
BE1-DFPR relays have been type tested in accordance with the requirements of IEC 255-5 and ANSI/IEEE
C37.90.1-1989. One-minute dielectric (high potential) tests of the assembled switchgear or control panel
wiring may be performed using up to 1500 Vac (45-65 Hz). Note that decoupling capacitors (0.01
microfarad) are employed from all terminals to surge ground. Accordingly, a leakage current of
approximately 5.6 milliamperes per terminal is to be expected when high potting at 1500 Vac, 60 hertz.
MOUNTING
BE1-DFPR relays are designed to be rack-mounted. Overall dimensions are shown in Figure 4-1. BE1-
DFPR relays may also be panel mounted. Use the cutout dimensions of Figure 4-2 as a guide. Relays may
be mounted at any convenient angle. Horizontal and vertical mount relays have the same overall and cutout
dimensions. Metric dimensions are shown in parentheses.
Содержание BE1-DFPR
Страница 1: ... 05647 6 10 07 14 564 76 10 4 2416 6 10 4 24 7PKV 4GXKUKQP 4 PF 5WDUGSWGPV 2WDNKECVKQP 4GXKUKQP ...
Страница 10: ...BE1 DFPR General Information 1 4 Figure 1 1 Terminal Screens Flow Diagram Sheet 1 Of 2 ...
Страница 11: ...BE1 DFPR General Information 1 5 ...
Страница 12: ...BE1 DFPR General Information 1 6 Figure 1 2 Terminal Screens Flow Diagram Sheet 2 Of 2 ...
Страница 15: ...BE1 DFPR General Information 1 9 ...
Страница 23: ...BE1 DFPR General Information 1 17 ...
Страница 24: ...BE1 DFPR General Information 1 18 Figure 1 4 Style Number Identification Chart ...
Страница 26: ...BE1 DFPR General Information 1 20 KIWTG 6KOKPI 1RVKQP 5 5JQTV PXGTUG ...
Страница 27: ...BE1 DFPR General Information 1 21 ...
Страница 28: ...BE1 DFPR General Information 1 22 KIWTG 6KOKPI 1RVKQP QPI PXGTUG ...
Страница 29: ...BE1 DFPR General Information 1 23 ...
Страница 30: ...BE1 DFPR General Information 1 24 KIWTG 6KOKPI 1RVKQP GHKPKVG 6KOG ...
Страница 31: ...BE1 DFPR General Information 1 25 ...
Страница 32: ...BE1 DFPR General Information 1 26 KIWTG 6KOKPI 1RVKQP QFGTCVG PXGTUG ...
Страница 33: ...BE1 DFPR General Information 1 27 ...
Страница 34: ...BE1 DFPR General Information 1 28 KIWTG 6KOKPI 1RVKQP PXGTUG ...
Страница 35: ...BE1 DFPR General Information 1 29 ...
Страница 36: ...BE1 DFPR General Information 1 30 KIWTG 6KOKPI 1RVKQP 8 8GT PXGTUG ...
Страница 37: ...BE1 DFPR General Information 1 31 ...
Страница 38: ...BE1 DFPR General Information 1 32 KIWTG 6KOKPI 1RVKQP ZVTGOGN PXGTUG ...
Страница 39: ...BE1 DFPR General Information 1 33 ...
Страница 40: ...BE1 DFPR General Information 1 34 KIWTG 6KOKPI 1RVKQP 5 5VCPFCTF PXGTUG ...
Страница 41: ...BE1 DFPR General Information 1 35 ...
Страница 42: ...BE1 DFPR General Information 1 36 KIWTG 6KOKPI 1RVKQP 5 8GT PXGTUG ...
Страница 43: ...BE1 DFPR General Information 1 37 ...
Страница 44: ...BE1 DFPR General Information 1 38 KIWTG 6KOKPI 1RVKQP 5 ZVTGOGN PXGTUG ...
Страница 45: ...BE1 DFPR General Information 1 39 ...
Страница 46: ...BE1 DFPR General Information 1 40 KIWTG 6KOKPI 1RVKQP 5 QPI 6KOG PXGTUG ...
Страница 47: ...BE1 DFPR General Information 1 41 ...
Страница 48: ...BE1 DFPR General Information 1 42 KIWTG 6KOKPI 1RVKQP KZGF 6KOG ...
Страница 50: ...BE1 DFPR Controls and Indicators 2 2 Figure 2 1 BE1 DFPR Horizontal Mount ...
Страница 51: ...BE1 DFPR Controls and Indicators 2 3 ...
Страница 52: ...BE1 DFPR Controls and Indicators 2 4 Figure 2 2 BE1 DFPR Vertical Mount ...
Страница 56: ...BE1 DFPR Controls and Indicators 2 8 KIWTG 9 G GNVC 5YKVEJ QECVKQP P CIPGVKEU QFWNG QTK QPVCN QWPV ...
Страница 57: ...BE1 DFPR Controls and Indicators 2 9 Figure 2 3 Control Module Front Panel Horizontal Mount ...
Страница 59: ...BE1 DFPR Functional Description 3 2 ...
Страница 60: ...BE1 DFPR Functional Description 3 3 ...
Страница 61: ...BE1 DFPR Functional Description 3 4 KIWTG WPEVKQPCN NQEM KCITCO ...
Страница 70: ...BE1 DFPR Functional Description 3 13 and 50TN ...
Страница 85: ...BE1 DFPR Installation 4 2 ...
Страница 86: ...BE1 DFPR Installation 4 3 Figure 4 1 Outline Dimensions Rack Mounting ...
Страница 87: ...BE1 DFPR Installation 4 4 ...
Страница 88: ...BE1 DFPR Installation 4 5 Figure 4 2 Outline Dimensions Panel Mounting ...
Страница 90: ...BE1 DFPR Installation 4 7 Figure 4 3 DC Control Connections Typical ...
Страница 91: ...BE1 DFPR Installation 4 8 ...
Страница 92: ...BE1 DFPR Installation 4 9 Figure 4 4 Connection Diagram ...
Страница 93: ...BE1 DFPR Installation 4 10 ...
Страница 94: ...BE1 DFPR Installation 4 11 Figure 4 5 BE1 DFPR Rear View ...
Страница 95: ...BE1 DFPR Installation 4 12 ...
Страница 96: ...BE1 DFPR Installation 4 13 Figure 4 6 Communications Interface ...
Страница 97: ...BE1 DFPR Installation 4 14 ...
Страница 98: ...BE1 DFPR Installation 4 15 Figure 4 7 RS 232 Connection Diagram For IBM Type Computers ...
Страница 99: ...BE1 DFPR Installation 4 16 Figure 4 8 RS 232 Connection Diagram for Protective Relay Terminals ...
Страница 100: ...BE1 DFPR Installation 4 17 Figure 4 9 RS 232 Interconnection Diagram For RFL 9660 Switch ...
Страница 102: ...BE1 DFPR Testing 5 2 Step 6 Operate the Status Targets Select switch and verify that the time and date are correct ...
Страница 103: ...BE1 DFPR Testing 5 3 ...
Страница 104: ...BE1 DFPR Testing 5 4 Figure 5 1 BE1 DFPR Test Simulator Front View ...
Страница 105: ...BE1 DFPR Testing 5 5 ...
Страница 106: ...BE1 DFPR Testing 5 6 Figure 5 2 BE1 DFPR Test Simulator Rear View ...
Страница 107: ...BE1 DFPR Testing 5 7 ...
Страница 108: ...BE1 DFPR Testing 5 8 Figure 5 3 BE1 DFPR Test Simulator Schematic Diagram Sheet 1 of 2 ...
Страница 109: ...BE1 DFPR Testing 5 9 ...
Страница 110: ...BE1 DFPR Testing 5 10 Figure 5 4 BE1 DFPR Test Simulator Schematic Diagram Sheet 2 of 2 ...
Страница 111: ...BE1 DFPR Testing 5 11 ...
Страница 112: ...BE1 DFPR Testing 5 12 Figure 5 5 Test Setup Diagram ...
Страница 114: ...BE1 DFPR Testing 5 14 ...
Страница 134: ...BE1 81 O U Maintenance 6 2 ...