BE1-DFPR Controls and Indicators
2-7
Figure 2-5. Magnetics Module, Front Panel
Horizontal Mount With Connection Plugs
MAGNETICS MODULE (Figure 2-5)
Input transformers in the magnetics module isolate the relay from the system and
step down the currents and voltages to the levels the internal circuits require. A
switch located behind the magnetics front panel is provided to connect the voltage
transformers in a wye or delta configuration. (Refer to Figure 2-6 for a cutaway
view of the switch.)
If four wire, line to neutral voltages are used, the wye/delta switch must be in the
wye position. If three wire, line to line voltages are used, the switch must be in the
delta position. If two wire, phase B, line to neutral voltage is used, the switch must
be in the wye position.
If the switch position is changed, the corresponding 3/1 PH WYE/DELTA setting in
the INSTALLATION SETTINGS screen must also be changed. In the
INSTALLATION SETTINGS screen, use setting 1 when the wye position is
selected for single-phase operation.
Use setting 2 when the delta position
is selected, and setting 3 when the
wye position is selected for three-
phase operation. Refer to the
INSTALLATION SETTINGS screen
under REVIEW/EDIT SETTINGS
menu as described in publication 9
2315 00 991,
Terminal Displays and
Settings.
Front panel connection plugs are
optional items. When present,
connection plugs are accessed by
removing the magnetics module front
panel. To remove the magnetics
module front panel, place a flat blade
tool in the notch at the top of the
panel. Pry the panel outward until
the panel snaps out, and then lift the
panel up and away from the relay
case.
Current and voltage inputs and
control outputs can be tested by
removing the connection plugs and
replacing them with test plugs (Basler
part number 10095 or G.E. model
XLA12A). Doing this disconnects
these inputs and outputs from the
relay internal circuits. With the test
plugs installed, test inputs can be
injected, and the relay trip and close
outputs can be monitored.
Содержание BE1-DFPR
Страница 1: ... 05647 6 10 07 14 564 76 10 4 2416 6 10 4 24 7PKV 4GXKUKQP 4 PF 5WDUGSWGPV 2WDNKECVKQP 4GXKUKQP ...
Страница 10: ...BE1 DFPR General Information 1 4 Figure 1 1 Terminal Screens Flow Diagram Sheet 1 Of 2 ...
Страница 11: ...BE1 DFPR General Information 1 5 ...
Страница 12: ...BE1 DFPR General Information 1 6 Figure 1 2 Terminal Screens Flow Diagram Sheet 2 Of 2 ...
Страница 15: ...BE1 DFPR General Information 1 9 ...
Страница 23: ...BE1 DFPR General Information 1 17 ...
Страница 24: ...BE1 DFPR General Information 1 18 Figure 1 4 Style Number Identification Chart ...
Страница 26: ...BE1 DFPR General Information 1 20 KIWTG 6KOKPI 1RVKQP 5 5JQTV PXGTUG ...
Страница 27: ...BE1 DFPR General Information 1 21 ...
Страница 28: ...BE1 DFPR General Information 1 22 KIWTG 6KOKPI 1RVKQP QPI PXGTUG ...
Страница 29: ...BE1 DFPR General Information 1 23 ...
Страница 30: ...BE1 DFPR General Information 1 24 KIWTG 6KOKPI 1RVKQP GHKPKVG 6KOG ...
Страница 31: ...BE1 DFPR General Information 1 25 ...
Страница 32: ...BE1 DFPR General Information 1 26 KIWTG 6KOKPI 1RVKQP QFGTCVG PXGTUG ...
Страница 33: ...BE1 DFPR General Information 1 27 ...
Страница 34: ...BE1 DFPR General Information 1 28 KIWTG 6KOKPI 1RVKQP PXGTUG ...
Страница 35: ...BE1 DFPR General Information 1 29 ...
Страница 36: ...BE1 DFPR General Information 1 30 KIWTG 6KOKPI 1RVKQP 8 8GT PXGTUG ...
Страница 37: ...BE1 DFPR General Information 1 31 ...
Страница 38: ...BE1 DFPR General Information 1 32 KIWTG 6KOKPI 1RVKQP ZVTGOGN PXGTUG ...
Страница 39: ...BE1 DFPR General Information 1 33 ...
Страница 40: ...BE1 DFPR General Information 1 34 KIWTG 6KOKPI 1RVKQP 5 5VCPFCTF PXGTUG ...
Страница 41: ...BE1 DFPR General Information 1 35 ...
Страница 42: ...BE1 DFPR General Information 1 36 KIWTG 6KOKPI 1RVKQP 5 8GT PXGTUG ...
Страница 43: ...BE1 DFPR General Information 1 37 ...
Страница 44: ...BE1 DFPR General Information 1 38 KIWTG 6KOKPI 1RVKQP 5 ZVTGOGN PXGTUG ...
Страница 45: ...BE1 DFPR General Information 1 39 ...
Страница 46: ...BE1 DFPR General Information 1 40 KIWTG 6KOKPI 1RVKQP 5 QPI 6KOG PXGTUG ...
Страница 47: ...BE1 DFPR General Information 1 41 ...
Страница 48: ...BE1 DFPR General Information 1 42 KIWTG 6KOKPI 1RVKQP KZGF 6KOG ...
Страница 50: ...BE1 DFPR Controls and Indicators 2 2 Figure 2 1 BE1 DFPR Horizontal Mount ...
Страница 51: ...BE1 DFPR Controls and Indicators 2 3 ...
Страница 52: ...BE1 DFPR Controls and Indicators 2 4 Figure 2 2 BE1 DFPR Vertical Mount ...
Страница 56: ...BE1 DFPR Controls and Indicators 2 8 KIWTG 9 G GNVC 5YKVEJ QECVKQP P CIPGVKEU QFWNG QTK QPVCN QWPV ...
Страница 57: ...BE1 DFPR Controls and Indicators 2 9 Figure 2 3 Control Module Front Panel Horizontal Mount ...
Страница 59: ...BE1 DFPR Functional Description 3 2 ...
Страница 60: ...BE1 DFPR Functional Description 3 3 ...
Страница 61: ...BE1 DFPR Functional Description 3 4 KIWTG WPEVKQPCN NQEM KCITCO ...
Страница 70: ...BE1 DFPR Functional Description 3 13 and 50TN ...
Страница 85: ...BE1 DFPR Installation 4 2 ...
Страница 86: ...BE1 DFPR Installation 4 3 Figure 4 1 Outline Dimensions Rack Mounting ...
Страница 87: ...BE1 DFPR Installation 4 4 ...
Страница 88: ...BE1 DFPR Installation 4 5 Figure 4 2 Outline Dimensions Panel Mounting ...
Страница 90: ...BE1 DFPR Installation 4 7 Figure 4 3 DC Control Connections Typical ...
Страница 91: ...BE1 DFPR Installation 4 8 ...
Страница 92: ...BE1 DFPR Installation 4 9 Figure 4 4 Connection Diagram ...
Страница 93: ...BE1 DFPR Installation 4 10 ...
Страница 94: ...BE1 DFPR Installation 4 11 Figure 4 5 BE1 DFPR Rear View ...
Страница 95: ...BE1 DFPR Installation 4 12 ...
Страница 96: ...BE1 DFPR Installation 4 13 Figure 4 6 Communications Interface ...
Страница 97: ...BE1 DFPR Installation 4 14 ...
Страница 98: ...BE1 DFPR Installation 4 15 Figure 4 7 RS 232 Connection Diagram For IBM Type Computers ...
Страница 99: ...BE1 DFPR Installation 4 16 Figure 4 8 RS 232 Connection Diagram for Protective Relay Terminals ...
Страница 100: ...BE1 DFPR Installation 4 17 Figure 4 9 RS 232 Interconnection Diagram For RFL 9660 Switch ...
Страница 102: ...BE1 DFPR Testing 5 2 Step 6 Operate the Status Targets Select switch and verify that the time and date are correct ...
Страница 103: ...BE1 DFPR Testing 5 3 ...
Страница 104: ...BE1 DFPR Testing 5 4 Figure 5 1 BE1 DFPR Test Simulator Front View ...
Страница 105: ...BE1 DFPR Testing 5 5 ...
Страница 106: ...BE1 DFPR Testing 5 6 Figure 5 2 BE1 DFPR Test Simulator Rear View ...
Страница 107: ...BE1 DFPR Testing 5 7 ...
Страница 108: ...BE1 DFPR Testing 5 8 Figure 5 3 BE1 DFPR Test Simulator Schematic Diagram Sheet 1 of 2 ...
Страница 109: ...BE1 DFPR Testing 5 9 ...
Страница 110: ...BE1 DFPR Testing 5 10 Figure 5 4 BE1 DFPR Test Simulator Schematic Diagram Sheet 2 of 2 ...
Страница 111: ...BE1 DFPR Testing 5 11 ...
Страница 112: ...BE1 DFPR Testing 5 12 Figure 5 5 Test Setup Diagram ...
Страница 114: ...BE1 DFPR Testing 5 14 ...
Страница 134: ...BE1 81 O U Maintenance 6 2 ...