5-6
BE1-50/51B-219/-226 Testing
9252000981 Rev G
Step 1. Prepare to apply 0.3 amperes input current to terminals 8 and 9 and record the elapsed time from
when current is applied until TIME output contacts close.
Step 2. Apply the current (step from 0 to 0.3 amperes) and record the elapsed time. Elapsed time should
be 1.754 to 2.084 seconds. (This tolerance is greater than ±2 % because it is the accumulation
of both pickup and timing tolerances.)
Step 3. Remove input current.
Target Test
Perform preliminary setup:
•
Connect test setup as shown in Figure 5-2.
•
Insure that SW3 switches are set: SW3-1 for the operating frequency, SW3-2 to OFF, SW3-3 to
ON, and SW3-4 ON.
•
Set TIME DIAL to 4.5.
•
Set CURVE to S
•
Set TIME PICKUP to 0.2.
•
Set INST PICKUP to 0.2.
Step 1. Set target current source to 1.0 ampere, ac.
Step 2. Apply 1 ampere input current to terminals 8 and 9. Check that both TIME and INST targets
operate.
Step 3. Remove input current and reset targets.
Manual Trip Test
Perform preliminary setup:
•
Connect test setup as shown in Figure 5-2.
•
Insure that SW3 switches are set: SW3-1 for the operating frequency, SW3-2 to OFF, SW3-3 to
ON, and SW3-4 ON.
•
Set TIME DIAL to 4.5.
•
Set CURVE to S
•
Set TIME PICKUP to 0.2.
•
Set INST PICKUP to 0.2.
Step 1. Set target current source to 1.0 ampere, ac.
Step 2. Apply 0.15 ampere input current to terminals 8 and 9. (0.15 ampere provides input power but
stays below pickup.)
Step 3. Connect a jumper between TIME MANUAL TRIP test points. Check that TIME target operates.
Step 4. Connect a jumper between INST MANUAL TRIP test points. Check that INST target operates.
Step 5. Reset targets.
Integrating Reset Test
Perform preliminary setup:
•
Connect test setup as shown in Figure 5-1.
•
Insure that SW3 switches are set: SW3-1 for the operating frequency, SW3-2 to OFF, SW3-3 to
ON, and SW3-4 ON.
•
Set TIME DIAL to 4.5.
•
Set CURVE to I.
•
Set TIME PICKUP to 0.20.
•
Set INST PICKUP to 18.0.
CAUTION
Trip circuit voltage is present at the front panel test points. When shorting the test
points, use insulated jumpers to avoid contact with these voltages.
Содержание BE1-50/51B-219
Страница 2: ......
Страница 6: ...iv BE1 50 51B 219 226 Introduction 9252000981 Rev G This page intentionally left blank...
Страница 8: ...vi BE1 50 51B 219 226 Introduction 9252000981 Rev G This page intentionally left blank...
Страница 10: ...ii BE1 50 51B 219 226 General Information 9252000981 Rev G This page intentionally left blank...
Страница 20: ...1 10 BE1 50 51B 219 226 General Information 9252000981 Rev G This page intentionally left blank...
Страница 22: ...ii BE1 50 51B 219 226 Controls and Indicators 9252000981 Rev G This page intentionally left blank...
Страница 24: ...2 2 BE1 50 51B 219 226 Controls and Indicators 9252000981 Rev G P0053 50 SW3 Figure 2 2 Location of SW3...
Страница 26: ...2 4 BE1 50 51B 219 226 Controls and Indicators 9252000981 Rev G This page intentionally left blank...
Страница 28: ...ii BE1 50 51B 219 226 Functional Description 9252000981 Rev G This page intentionally left blank...
Страница 32: ...ii BE1 50 51B 219 226 Installation 9252000981 Rev G This page intentionally left blank...
Страница 38: ...ii BE1 50 51B 219 226 Testing 9252000981 Rev G This page intentionally left blank...
Страница 46: ...5 8 BE1 50 51B 219 226 Testing 9252000981 Rev G This page intentionally left blank...
Страница 48: ...ii BE1 50 51B 219 226 Time Characteristic Curves 9252000981 Rev G This page intentionally left blank...