5-8
BE1-50/51B-214/-215/-223/-225 Testing
9252000994 Rev N
Step 5. Decrease input current until INST output contacts open.
Perform preliminary setup:
Time Dial Test
•
Connect test setup as shown in Figure 5-1.
•
Insure that SW3 switches are set: SW3-1 for the operating frequency, SW3-2 to OFF, SW3-3 to
ON, and SW3-4 ON.
•
Set TIME DIAL to 4.5.
•
Set CURVE to S
•
Set TIME PICKUP to 0.2.
•
Set INST PICKUP to 18.0.
Step 1. Prepare to apply 0.3 amperes input current to terminals 5 and 6 and record the elapsed time from
when current is applied until TIME output contacts close.
Step 2. Apply the current (step from 0 to 0.3 amperes) and record the elapsed time. Elapsed time should
be 0.345 to 0.424 seconds. (This tolerance is greater than ±2% because it is the accumulation
of both pickup and timing tolerances.)
Step 3. Remove input current.
Perform preliminary setup:
Target Test
•
Connect test setup as shown in Figure 5-2.
•
Insure that SW3 switches are set: SW3-1 for the operating frequency, SW3-2 to OFF, SW3-3 to
ON, and SW3-4 ON.
•
Set TIME DIAL to 4.5.
•
Set CURVE to S
•
Set TIME PICKUP to 0.2.
•
Set INST PICKUP to 19.8.
Step 1. Set voltage source to provide a target current of 1.0 ampere.
Step 2. Apply 1 ampere input current to terminals 5 and 6. Check that the TIME target operates.
Step 3. Remove input current and reset target.
Step 4. Set TIME PICKUP to 3.18 and set INST PICKUP to 0.2.
Step 5. Set voltage source to provide a target current of 1.0 ampere.
Step 6. Apply 1 ampere input current to terminals 5 and 6. Check that the INST target operates.
Step 7. Remove input current and reset target.
Perform preliminary setup:
Manual Trip Test
•
Connect test setup as shown in Figure 5-2.
•
Insure that SW3 switches are set: SW3-1 for the operating frequency, SW3-2 to OFF, SW3-3 to
ON, and SW3-4 ON.
•
Set TIME DIAL to 4.5.
•
Set CURVE to S
•
Set TIME PICKUP to 0.2.
•
Set INST PICKUP to 0.2.
Step 1. Set voltage source to provide a target current of 1.0 ampere.
WARNING!
Trip circuit voltage is present at the front panel test points. When shorting the test
points, use insulated jumpers to avoid contact with these voltages.
Содержание BE1-50/51B-214
Страница 2: ......
Страница 6: ...iv BE1 50 51B 214 215 223 225 Introduction 9252000994 Rev N This page intentionally left blank...
Страница 8: ...vi BE1 50 51B 214 215 223 225 Introduction 9252000994 Rev N This page intentionally left blank...
Страница 10: ...ii BE1 50 51B 214 215 223 225 General Information 9252000994 Rev N This page intentionally left blank...
Страница 20: ...1 10 BE1 50 51B 214 215 223 225 General Information 9252000994 Rev N This page intentionally left blank...
Страница 22: ...ii BE1 50 51B 214 215 223 225 Controls and Indicators 9252000994 Rev N This page intentionally left blank...
Страница 24: ...2 2 BE1 50 51B 214 215 223 225 Controls and Indicators 9252000994 Rev N Figure 2 2 Location of SW3 P0053 50...
Страница 26: ...2 4 BE1 50 51B 214 215 223 225 Controls and Indicators 9252000994 Rev N This page intentionally left blank...
Страница 28: ...ii BE1 50 51B 214 215 223 225 Functional Description 9252000994 Rev N This page intentionally left blank...
Страница 32: ...3 4 BE1 50 51B 214 215 223 225 Functional Description 9252000994 Rev N This page intentionally left blank...
Страница 34: ...ii BE1 50 51B 214 215 223 225 Installation 9252000994 Rev N This page intentionally left blank...
Страница 39: ...9252000994 Rev N BE1 50 51B 214 215 223 225 Installation 4 5 Figure 4 4 DC Control Connections BE1 50 51B 215...
Страница 42: ...ii BE1 50 51B 214 215 223 225 Testing 9252000994 Rev N This page intentionally left blank...
Страница 52: ...5 10 BE1 50 51B 214 215 223 225 Testing 9252000994 Rev N This page intentionally left blank...
Страница 54: ...ii BE1 50 51B 214 215 223 225 Time Characteristic Curves 9252000994 Rev N This page intentionally left blank...
Страница 69: ......