Installation Instructions
117723
21 / 68
EN
The appliance is delivered with a certified power cord and plug: it is
prohibited to manipulate them or modify them.
Potential Equalising Connection
• The potential equalising connection between various appliances should be
executed at the connection clamp, marked with
symbol.
• The connection clamp is found at the back of the appliance.
• This clamp renders it possible to connect a potential equalising cord with section
of 4 mm²
– 10 mm².
Adjustment of Door Locking Pin
After placing the appliance in the selected location, check the closing mechanism
and position of door seals on the thermal processing chamber.
It is possible to adjust the depth of the
locking pin in order to assure that the
chamber is properly locked during thermal
processing.
It is possible to adjust the door pressure
against the seal. Screw the pin in to
increase the pressure or screw it out to
reduce the pressure (Fig. 6).
Fig. 6
After adjustment, re-tighten the bolt making sure that the lock anchor is pointed
downwards.
5.2
Inspections and Commissioning Test
Inspections Prior to Start-up
Before the first start-up, electric appliances must be thoroughly inspected in order to
confirm the consistency of the appliance and its installation with regulations in force,
technical data, and recommendations for safety.
The following conditions must be met:
– Temperature in the installation location must 4°C.
– The thermal processing chamber must be empty.
– All packaging elements must be fully removed, including the protective
film on external walls.
– Ventilation openings cannot be covered nor obstructed.