Installation Instructions
22 / 68
117723
EN
– Parts disassembled during installation of the appliance must be re-
assembled.
– The main switch of the electric installation must be on, and water shut-off
valve upstream of the appliance must be open.
First Start-up
The commissioning of the appliance is realized upon the basis of the test cycle
allowing for checking the correctness of operation and revealing any damages or
problems.
Switch the appliance on with ON/OFF key (1, Fig. 7).
Set the cooking/roasting cycle with the following parameters:
Time: 10 minutes
Temperature: 150°C
Steam injection: 5%
Inspection During Commissioning
When commissioning, the following conditions must be met:
– The internal lighting is switched on by pressing respective key (3, Fig. 7),
and then switches off automatically after 45 seconds unless it is switched
off earlier by pressing the same key again.
– The appliance switches off after opening the door and switches back on
after closing it.
– In appliances with two fans, motors feature the same direction of rotation.
– Fan motors automatically change direction every 3 minutes (time
depends on thermal processing duration).
– After setting the steam injection, water flows out of the water hose in the
thermal processing chamber towards the fan.
– At the end of the cooking/roasting cycle, an acoustic signal sounds for
approx. 15 seconds. It is off automatically after a couple of seconds.