Installation and operation
105862
13 / 40
EN
• Place the appliance in a way making the connections easily accessible, so that
they may be quickly disconnected if such a need arises.
• The appliance should be placed on surfaces that are:
– even, with sufficient bearing capacity, resistant to water, dry and resistant to
high temperatures;
– sufficiently large, and thus enabling usage of the appliance with no
problems;
– easily accessible;
– well ventilated.
Built-in Installation
The appliance is designed to be installed in a worktop table board. Before
installation of the heating plate, make sure that:
– the worktop table board is level and none of its elements influence the space
requirements,
– the worktop table board is made of a material resistant to high temperatures
and isolated, so that it does not get deformed when subject to heat radiation
from the appliance,
– the heating plate will not be installed directly above a dish-washing machine,
refrigerator, freezer, washing machine or clotheshorse, as humidity may
damage electronics of the heating plate,
– an oven features a built-in fan should the appliance be installed over an
oven,
– the installation meets all requirements for approval, as well as standards and
regulations in force,
– the fixed wiring is equipped with an integrated disconnecting device, which is
mounted and located as per local regulations and regulations pertaining to
wiring, and provides for full power supply insulation,
– the disconnecting device feature approval and an air gap with contacts pitch
of 3 mm on all poles (or in all active
— i.e. phase — wires) should local
regulations pertaining to wiring allow for such variant of requirements,
– with the installed heating plate the disconnecting device is easily accessible
for the user,
– materials used in surfaces of walls that surround he induction plate are
resistant to high temperatures and easy to clean (e.g. ceramic tiles),
– the rear wall, neighbouring and surrounding surfaces must withstand the
temperature of 90°C,
– the worktop table board's thickness meets the required load-bearing
capacities and is 30 mm at minimum.
Содержание IKF 72-2Z
Страница 1: ...IKF 72 2Z 105862...