GB
26
GB
C Replacement of the auger, water seal, bea-
rings and coupling
1 Remove the panels.
2 Follow the steps at item H to remove the ice
spout.
3 On model F120 unloose and remove two
screws and washers holding tight the spout
bracket to the freezing cylinder.
4 On model F120 grasp the wire cap hook at
the top of the freezer and pull out the auger,
attached cap and icebreaker from the top of
the freezer.
D Replacement of the gear motor assy
1 Remove the front/top and side/rear panels.
2 Remove the three/four bolts and washers
securingthegear reducerbase to theunit-
chassis, then remove bolts and lockwasher-
swhich attach the bottom of the aluminium
adaptor to the gear reducer case cover.
3 Follow the steps of item E to remove the gear
motor magnetic sensor.
4 Trace and disconnect the electric wires leads
of the drive motor. Lift and remove the entire
gear motor assembly.
E Change of the water level sensors in the
bath
1 Remove the upper plate
2 Loosen the fastening nuts of the ring cable
lugs of both the rod made of stainless steel –
water sensors -, which are found on the cover
of the swimming pool
3 Search for the terminal of the lowest water
sensor with two red mandrels in the back part
of the switch box and pull them out of their
position by pressing on the fastening strap.
4 Proceed with the installation of the new lowe-
st sensor in the reverse order.
F Change of the control card
1 Remove the front upper plate
2 Search for the terminal of the single sensor
with two red mandrels in the back part of the
switch box and pull them out of their position
through pressing on the fastening strap.
3 Pull off the terminals for the electrical con-
nections of the back part of the control card
and then remove the whole control card by
loosening the four screws, with which it is
fastened in the electrical switch box made of
plastic
4 Proceed with the installation of the new lowe-
st sensor in the reverse order
G Change of the ice discharge opening
1 Loosen the screws and remove the upper
plate.
2 Remove the wing nuts and the take the ope-
ning from the ice removal canal. Work on the
optical reading device, so that these are not
damaged.
3 The two shells, with which the polystyrene
bowls in the upper part of the evaporators
are fastened, and remove both the insulating
bowls.
4 Pull out the opening made of stainless steel
from its upper bronze part with the F 125
models, for the other models loosen both
bolts, with which they are fastened in the ice-
breaker.
5 For Model F125 loosen both bolts, with which
the bronze opening is fastened to the evapo-
rator and free it.
6 Proceed with the installation of the new ope-
ning in the reverse order.
NOTE.
If the auger cannot be pulled out, pro-
ceed to steps 10 and 11 of this paragraph, to
gain access to the auger bottom. Then, with a
rowhide mallet or placing a piece of wood on
the bottomend of the auger, tap this bottom to
break loose the auger and be able then to pull
it out as per step 4 above.
NOTE.
In F 125 and F 80 models inspect the
rectangular rubber seal of the nozzle and, if
damaged, replace it.
Содержание F 120
Страница 1: ...ELECTRONIC MODULAR FLAKERS SERVICE MANUAL 104409 F80 104436 F125 71503135 0 000 service Flakers GB ...
Страница 2: ......
Страница 42: ...71503135 0 000 service Flakers GB ...