Manual 2100-752C
Page
8 of 41
Minimum Installation Height
The minimum installation height of the unit with a free
blow plenum is 8' 6". This provides enough clearance
for the plenum to be removed (see Figure 5).
The minimum installation height for ducted
applications is 8' 4-1/2". This provides enough
clearance to install the duct work (see Figure 6).
FIGURE 5
Installation with Duct-Free Plenum
8 FT. - 5 IN.
8 FT. - 6 IN.
MINIMUM REQUIRED
INSTALLATION HEIGHT
MIS-4174
FLOOR
MIS-4174
FIGURE 6
Ducted Application
7 FT. - 4 IN.
UNIT HEIGHT
8 FT. - 7 IN.
MINIMUM RECOMENDED
CEILING HEIGHT
MIS-4175
12 IN.
MINIMUM
BOTTOM
TO DUCT
2 IN. MINIMUM
FROM DUCT
FLANGE
8 FT. - 4.5 IN.
MINIMUM REQUIRED
INSTALLATION HEIGHT
DUCT FLANGE
DUCT
FLOOR
20 IN.
MINIMUM
FIXED CEILING
SUSPENDED CEILING
MIS-4175
Содержание Q-TEC Q A4D Series
Страница 2: ......
Страница 24: ......
Страница 41: ...Manual 2100 752C Page 17 of 41 MIS 2471 A REMOVE KNOCK OUT FOR INDOOR DRAIN HOSE CONNECTOR FIGURE 18C If used ...
Страница 64: ...Manual 2100 752C Page 40 of 41 GRAPH 2 Q42A4D FAD Ventilation Delivery GRAPH 1 Q36A4D FAD Ventilation Delivery ...
Страница 65: ...Manual 2100 752C Page 41 of 41 GRAPH 3 Q48A4D FAD Ventilation Delivery ...
Страница 66: ......
Страница 81: ...Manual 2110 1568G Page 15 of 17 This page intentionally left blank ...
Страница 84: ......
Страница 95: ......