Manual 2100-694B
Page
59 of 62
FIGURE 68
DEC Star Motor Plug Testing
A. Measurement steps (from Figure 68).
1 Phase A to Phase C
2 Phase A to Phase B
3 Phase B to Phase C
4 Phase A to Ground
5 Phase B to Ground
6 Phase C to Ground
22. Resistance should be equal and none should be
grounded.
A. If this fails, replace the blower assembly.
B. If it passes, replace the control module.