Installation setup
4-1
5976257 BARCOREALITY 909 16032001
4
INSTALLATION SETUP
Access to Controls
Warning
Risk of electric shock !
The installation should only be done by BARCO authorized service personnel
Opening the top cover
During the projector setup and installation it is necessary to open the top cover. Follow the procedure described below :
1 Turn the locking screw with a screwdriver counter clockwise (Image 1).
Caution:
The projector's top cover is
not
supported with locking hinge. Open with care and support the cover with your hand.
2 Lift up and pivot the top cover backwards (Image 2).
$
Image 1
Image 2
Содержание R9040014
Страница 1: ...BARCO PROJECTION SYSTEMS Date 16032001 INSTALLATION MANUAL Rev 00 REALITY 909 R9040014 Art No R5976257...
Страница 10: ...Packing and dimensions 2 2 5976257 BARCOREALITY 909 16032001 Projector dimensions in mm...
Страница 20: ...Installation setup 4 6 5976257 BARCOREALITY909 16032001...
Страница 40: ...Installation Adjustment Mode 7 8 5976257 BARCOREALITY 909 16032001...
Страница 44: ...Barco ceiling mount support A 2 5976257 BARCOREALITY 909 16032001...