5. Installation
Barco - OV-508/OV-513/OV-515– R5990099 – installation manual – revision 01– November 2007 ________________________________
________________________________
________________________________
________________________________________________
________________
________________
________________ 48
For the LAN cabling, proceed as per column.
Connect all projection units of a column to the LAN
switch installed in the same column or in the next
column.
Care for a clear layout!
Digital sources are connected to DVI 1 IN and/or
DVI 2 IN. DVI 1 IN is loop-through to DVI 1 OUT,
DVI 2 IN is loop-through to DVI 2 OUT.
In case a source has to be displayed on additional
projection modules, connect the respective DVI
output with one of the DVI inputs of the other
projection module
Step 55
The cables have to be fixed to the sidewalls via cable
ties. The cable ties are inserted into the square duct
of the plastic cable tie holders already mounted to
the left and right sidewalls.
5.16
Grounding
Step 56
Every support comes with a grounding kit which
consists of a grounding wire (5m), the required
fixation material and the label.
The wire is mounted on every second column, to the
vertical profile, using the screw provided by the rear
vertical profile, just above the foot. Unscrew this
screw, apply the washer, the cable lug, the spring
washer, and insert the screw again.
(This screw replaces the fixation screw included in
the grounding kit).
Finally apply the label!
Please note:
Connection of the grounding wire to the power net of
the customer has to be done by a qualified
electrician!
Barco only provides the connection to the display
wall!
Содержание OV-508
Страница 1: ...Installation manual OV 508 OV 513 OV 515 R5990099 ...
Страница 15: ......