5.1
OverView
Installation of a display wall starts with installation of all pedestals. When the pedestals are installed and all
columns are connected, leveled and aligned, the dark boxes are setup. Subsequently the screens are mounted.
Finally the projection unit, the illumination unit are installed. After the cabling is completed, the optical
adjustment is done. Finally the trim and shieldings are mounted.
Throughout the manual, "left" and "right" means left and right as seen from front of the display wall.
There are several kinds of screws used for setting up OV-D2 systems. The following table shows the required
torque for fixing the screws. When tightening screws, please stick to these values!
Component
Size
ItemNo
/description
Torque
Comment
Selftapping screw M6 x 29
B363372 SCR
$7500 M 6 x 29
STZN
max. 6Nm
screwed in Aluminium
Profiles 30X30 (60X30)
Selftapping screw
M6x16
B363373 SCR
$7500 M 6 x 16
STZN
max. 3Nm
screwed in Aluminium
Profiles 30X30 (60X30)
Torx Screw
(Metric)
M6 x 7
B362666 SCR
D7985TXM 6 X 7
STBK
min 3Nm;
max 6Nm
screwed in Nut B358674 PF X
ACC NUT SPGM6 B32-60
Kanya Connectors
PVS
Kanya-Connectors
B 20-10 PVS-VERB.
20-25Nm
Connection for Aluminium
Profiles 30X30 (60X30)