51
ENERGA 70-55 TUNNEL
11
REGULAR MAINTENANCE
• Emptying the ashtray
:
* Regularly check how much ash is in the
ashtray.
* Make sure the ashtray is never more than
¾ full. If the ashtray is more than ¾ full, it
can obstruct the fl ow of air to the fi re.
* Wait 24 hours after stoking before emptying
the ashtray.
• Cleaning the glass
:
As required
• Door seals
:
Check annually before heating is resumed.
Replace as necessary
• Sweep and inspect
:
Annually before heating is resumed
chimney
• Fire hearth interior
:
Check annually
* Replace panels as necessary
• Particulate fi lter
:
Remove any ash deposits with a hand brush
• Grate
:
Check annually for cracks / breakage
• Sliders/dampers
:
Check function annually
• Convection channels
:
Clean annually
• Paint
:
Annually, if necessary touch up with BARBAS
heat-resistant paint (do
not
paint when the fi re
is in use!)
• Parts
:
Individual parts for replacement/accessories
are available from your BARBAS dealer
Use only original parts
• Modifi cations
:
Introduced modifi cations to the appliance are
not permitted
Содержание ENERGA 70-55 TUNNEL
Страница 2: ......
Страница 3: ...3 ENERGA 70 55 TUNNEL ENERGA 70 55 TUNNEL...
Страница 4: ...4 ENERGA 70 55 TUNNEL...
Страница 6: ...6 ENERGA 70 55 TUNNEL...
Страница 8: ...8 ENERGA 70 55 TUNNEL...
Страница 10: ...10 ENERGA 70 55 TUNNEL...
Страница 53: ...53 ENERGA 70 55 TUNNEL 13 DIMENSIONS 13 1 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm...
Страница 54: ...54 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm 13 1 1 ENERGA 70 55 Tunnel 3 sided 35 mm frame...
Страница 55: ...55 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm 13 1 2 ENERGA 70 55 Tunnel 4 sided 35 mm frame...
Страница 61: ......