
31
ENERGA 70-55 TUNNEL
• Cover the top and side of the appliance to the front edge with c. 10 cm thick
insulating material (T
≥
700°C) (Class A1 according to DIN 4102 (= EN 13501)).
Leave a few centimetres clearance between the front of the chimney breast and the
appliance.
• Ensure the appliance is level by adjusting the feet to the correct height.
Use a no.17 spanner for this.
• Make a good seal between the fl ue outlet from the appliance to the chimney.
See also 2.7.
Ensure that the entire fl ue is gas-tight.
• Ventilate the chimney, by placing ventilation openings at the top and bottom of the
chimney breast.
• Close up the front.
Содержание ENERGA 70-55 TUNNEL
Страница 2: ......
Страница 3: ...3 ENERGA 70 55 TUNNEL ENERGA 70 55 TUNNEL...
Страница 4: ...4 ENERGA 70 55 TUNNEL...
Страница 6: ...6 ENERGA 70 55 TUNNEL...
Страница 8: ...8 ENERGA 70 55 TUNNEL...
Страница 10: ...10 ENERGA 70 55 TUNNEL...
Страница 53: ...53 ENERGA 70 55 TUNNEL 13 DIMENSIONS 13 1 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm...
Страница 54: ...54 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm 13 1 1 ENERGA 70 55 Tunnel 3 sided 35 mm frame...
Страница 55: ...55 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm 13 1 2 ENERGA 70 55 Tunnel 4 sided 35 mm frame...
Страница 61: ......