35
ENERGA 70-55 TUNNEL
Figure 3: Operation Energa 70-55 Tunnel
1 Flue outlet
7 Combustion air-supply slider
2 Convection air escape opening (4x)
(Combined operation for the primary
3
Operating pin fl ue gas fl ap
and secondary combustion air-supply)
4 Door (2x) (*)
8 Handle door
5 Locking slider for operating pin
9 Combustion air supply; underneath
6 Carrying bracket (can be
10 Convection air supply connection (2x side)
dismounted) (2x)
11 Adjustable feet (4x)
(*)
Only use the door that can depress the operating
pin as opening for fi lling the wood !
5
OPERATION OF THE BUILT-IN FIRE
Содержание ENERGA 70-55 TUNNEL
Страница 2: ......
Страница 3: ...3 ENERGA 70 55 TUNNEL ENERGA 70 55 TUNNEL...
Страница 4: ...4 ENERGA 70 55 TUNNEL...
Страница 6: ...6 ENERGA 70 55 TUNNEL...
Страница 8: ...8 ENERGA 70 55 TUNNEL...
Страница 10: ...10 ENERGA 70 55 TUNNEL...
Страница 53: ...53 ENERGA 70 55 TUNNEL 13 DIMENSIONS 13 1 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm...
Страница 54: ...54 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm 13 1 1 ENERGA 70 55 Tunnel 3 sided 35 mm frame...
Страница 55: ...55 ENERGA 70 55 TUNNEL Combustion air supply connection 125 mm 13 1 2 ENERGA 70 55 Tunnel 4 sided 35 mm frame...
Страница 61: ......