10.6.2
Install the cast iron side panels
Only do this procedure after finish of the procedure in section
.
1.
Put the top of a cast iron side panel
in the U-shaped holder (1).
2.
Move the panel to a vertical position
(2).
3.
Lower the panel (3).
4.
Repeat this procedure for the other
cast iron side panels.
10.6.3
Install the steel bottom plates
Only do this procedure after finish of the procedure in section
.
1.
Put a steel bottom plate on the
bottom of the combustion chamber.
2.
Move the steel bottom plate to the
left as much as possible.
3.
Put the other steel bottom plate on
the bottom of the combustion
chamber.
4.
Move the steel bottom plate to the
right as much as possible.
10.6.4
Install the cast iron rear panels
Only do this procedure after finish of the procedure in section
.
Note:
Install the fitting piece last.
Maintenance
48
Cuatro-7 75-60
Содержание Cuatro-7 75-60
Страница 6: ...1 Declaration of performance Declaration of performance 6 Cuatro 7 75 60...
Страница 56: ...11 2 Connections on Opti Air system Technical data 56 Cuatro 7 75 60...
Страница 59: ...12 Dimensions 12 1 Cuatro 7 75 60 with built in frame Dimensions Cuatro 7 75 60 59...
Страница 60: ...12 2 Cuatro 7 75 60 with built in frame and convection casing Dimensions 60 Cuatro 7 75 60...
Страница 66: ...12 8 Cuatro 7 75 60 with classic frame Dimensions 66 Cuatro 7 75 60...
Страница 67: ...12 9 Cuatro 7 75 60 with classic frame and convection casing Dimensions Cuatro 7 75 60 67...
Страница 75: ...Warranty Terms Cuatro 7 75 60 75...
Страница 76: ...Your Barbas dealer 001 28 06 2022 352574 271 001...