Commissioning
Mobile Panel 40/50 User's manual V1.80
69
3.3.2 Installing cables in the attachment shaft
After opening the attachment shaft, the connecting lines
can
be installed as shown in the following section.
3.3.2.1 Tips for opening the attachment shaft
•
Place the Mobile Panel
device
on a clean flat surface with the display facing down in a away that does not
damage the Mobile Panel or its operating elements (e.g.
ESD
mat).
•
Loosen the screws with a size 2 Phillips head screwdriver.
3.3.2.2 Notes regarding changes to the attachment shaft
•
Disconnect the main connector (ST1) by pulling carefully on its wires with your fingers (do not use sharp
object
s to help).
•
When disconnecting the RJ45 connector (ST2), make sure that the locking lever is pushed down.
ST2
ST1
ST1
1
2
Figure 43: Disconnecting ST1 and ST2
•
Make sure that the connector locks into place.
3.3.2.3 Note for closing the attachment shaft
•
The gasket must be clean, undamaged and positioned correctly in the attachment shaft cover.
•
Pinched cables are not permitted.
•
The attachment shaft cover must be refastened with all 6 screws (torque: 0.4 to 0.5 Nm). Only then
can
the corresponding degree of protection be ensured again.
3.3.3 Cable outlet
Cable outlet - Right
(cable duct view)
Cable outlet - Left
(cable duct view)
Ethernet cable
Figure 44: Cable outlet