17
Installation
Machine Foundation
Place the machine adjacent to the foundation. Do not attempt to move it by pushing on the
sides.
1. Remove the wood skid by unscrewing the carriage bolts holding it to the bottom
frame of the machine.
2. Carefully place the machine over the anchor bolts. Raise and level it 1/2 inch
above the floor on four points, using spacers that can be removed.
3. Fill the spaces between the machine base and floor with machinery grout. Grout
completely under the frame members. Remove front panel and rear panel to
gain access to all frame members. Force grout under the machine base until all
voids are filled.
4. Remove the spacers carefully, allowing the machine to settle into the wet grout.
5. Attached the mounting bolt washers and lock nuts to the anchor bolts after the
grout has hardened. Tighten the lock nuts by even increments-one after the
other-until all are tightened evenly and the machine is fastened securely to the
floor. The nuts should be tightened in a diagonal fashion, which will help ensure
equal tension at all anchor points. Retighten after one week of operation.
Do not isolate!
Bond to existing floor.
in pyrimid shape as shown.
Pour new concrete (3500 PSI)
Excavate under existing floor
with 3/4"GHT male connections
provide 3/4" ball valve cutoffs
(2) 1" water supply lines,
Electrical power inlet
(2) 3/4"GHT water lines
cutoff
Emergency electrical
for service
Recommended
12"
305 mm
30”
762 mm
12" (305 mm) Allowable
6" (152 mm) Recommended
12”
305 mm
MIN
24"
610 mm
MIN.
12"
305 mm
4”
102 mm
MIN
Содержание HP series
Страница 2: ......
Страница 15: ...Installation HP 65 Technical Specifications 14 ...
Страница 16: ...Installation HP 125 Technical Specifications 15 ...
Страница 19: ...Front of Machine 18 Installation Foundation Bolt Location Typical Grouting Pattern 5 each side ...
Страница 39: ......