Installation and Operations Manual
— VP Gate Operator
26
B&B ARMR
A Division of B&B Roadway and Security Solutions VP Revision B1
Symptom
Actions
5.
If voltage is correct, manually shift the detent in the center
of the solenoid on either side of the hydraulic valve, if
wheels move suspect hydraulic valve.
6.
If unit is a 3 phase unit and a new installation, reverse two
of the incoming power leads.