4.5 Setting The Inherent Safety
1.
Press the ESC button to return to the
main menu.
2.
Open and Close the operator using
the 3 button control station. The
screen on the left will appear.
3.
While the gate is running, pay
attention to the SYSTEM PRESS
value. This is the amount of pressure
required to move the gate.
4.
Stop the gate operator and press the
ESC button to enter the main menu.
5.
Select ‘Set Param’ and use the UP
arrow key to scroll to SAFE PSI.
6.
Press OK to activate the cursor.
Enter the On value (SYSTEM
PRESS+30), then the Off value (On-
10).
7.
Press OK to save and return to the
main menu.
5 Initial Operation
5.1 Test Run the Operator
1.
Make sure the counterweights are installed.
2.
Verify the Yoke is installed
3.
Make sure the power switch is ON
4.
Hit the Open button on the printed circuit board, or pushbutton control panel.
5.
Verify the gate opens to full open. The limit switch should stop the gate automatically,
however if the motor is still operating and the gate is fully open, stop the gate by pressing
the Stop button on the printed circuit board, pressing Stop pushbutton control panel, or by
turning the power switch off.
6.
If necessary make any adjustment to the open limit switch.
NOTE: While the gate is in the up position, the bolts for the bottom side of the gate
panel can be installed.
NOTE: If the primary power is three phase and the motor ran, but the gate did not move
to the open position, reverse two poles (swap to wires) of the three phase primary power.
7.
Hit the Close button on the printed circuit board or pushbutton control panel