
41
Standard Upper Vertical Auger Continued
Assembly
Required Hardware
Required Tools / Equipment
(1) Hinge Pin 29 3/4” P# 91323
(1) Vertical Pivot Pin 9” P# 91333
(2) Washer P# 81768
(2) Roll Pin P# 81767
Hammer
Crane
Lifting Tackle
Pin Punch
Attach crane to upper auger P# 71750 and align with lower auger pivot. See Figure 3. Insert hinge pin
P#
_
91323, then slide washer P# 81768 over hinge pin and secure with roll pin P# 81767. Align linkage
arm upper pivot P# 91304 and insert vertical pivot pin P# 91333. Slide washer over vertical pivot pin
and secure with roll pin P# 81767. Lower upper auger into cradle. See Figure 4.
P# 91333
P# 91333
P# 91323
P# 91323
P# 92304
P# 81768
P# 81767
P# 92422
Figure 4
Figure 3
Содержание Field Floater
Страница 1: ...Assembly Instructions July 2012 ...
Страница 53: ...53 Hydraulics Continued Assembly Figure 2 ...
Страница 68: ...68 Pre Startup Continued Lubrication ...
Страница 69: ...69 Pre Startup Continued Lubrication ...
Страница 70: ...70 Pre Startup Continued Lubrication ...
Страница 73: ...73 Notes ...
Страница 74: ...74 Notes ...