![BALZER Field Floater Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/balzer/field-floater/field-floater_assembly-instructions-manual_470525026.webp)
26
Lower Vertical Auger Continued
Assembly
Required Hardware
Required Tools / Equipment
(4) 3/4” X 3” Bolt P# 1315
(4) 3/4” Locknut P# 2593
(8) 3/4” Washer P# 1603
Crane
Lifting Tackle
Center Punch
Wrenches
Insert bolts P# 1315, washers P# 1603 on bolts and before lock nuts P# 2593. Tighten after securing
bolts and lock nuts around flange. See Figures 1 and 2.
P# 2593
P# 1603
P# 1315
P# 1603
Содержание Field Floater
Страница 1: ...Assembly Instructions July 2012 ...
Страница 53: ...53 Hydraulics Continued Assembly Figure 2 ...
Страница 68: ...68 Pre Startup Continued Lubrication ...
Страница 69: ...69 Pre Startup Continued Lubrication ...
Страница 70: ...70 Pre Startup Continued Lubrication ...
Страница 73: ...73 Notes ...
Страница 74: ...74 Notes ...