
15
Tongue
Assembly
Required Hardware
Required Tools / Equipment
(4) 1” X 3” Bolt P# 2534
(4) 1” Lock Nut P# 1779
Hoist Center Punch
Wrenches
Attach crane to grain cart. Raise cart and block in the air. Position Tongue assembly in front of grain
cart. Raise and remove temporary skids from tongue mounting bracket. The same hardware used to
secure temporary skids are used to attach the tongue assembly to the lower frame bracket, P# 2534 & P#
1779. Slide tongue assembly into position and insert the bolts and locknuts, tighten securely. See Figure
1.
Figure 1
P# 2534
P# 1779
Содержание Field Floater
Страница 1: ...Assembly Instructions July 2012 ...
Страница 53: ...53 Hydraulics Continued Assembly Figure 2 ...
Страница 68: ...68 Pre Startup Continued Lubrication ...
Страница 69: ...69 Pre Startup Continued Lubrication ...
Страница 70: ...70 Pre Startup Continued Lubrication ...
Страница 73: ...73 Notes ...
Страница 74: ...74 Notes ...