![baltur TBG 45 ME Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/baltur/tbg-45-me/tbg-45-me_user-instruction-manual_470429003.webp)
1 / 22
0006081533_201403
ENGLISH
- Before starting to use the burner for the first time, read carefully the chapter “WARNING NOTES FOR THE USER: HOW TO USE
THE BURNER SAFELY” in this instruction manual, which is an integral and essential part of the product.
- Read carefully the instructions before starting the burner and servicing it.
- The works on the burner and on the system should be carried out only by qualified personnel.
- The system power supply must be disconnected before starting working.
- If the works are not carried out correctly it is possible to cause dangerous accidents.
We hereby declare under our own responsibility, that our domestic and industrial
blown air burners fired by gas, oil and dual fuel series:
BPM...; BGN…; BT…; BTG…; BTL…; TBML...; Comist…; GI…; GI…Mist;
Minicomist…; PYR…; RiNOx…; Spark...; Sparkgas...; TBG...;TBL...; TS…;
IBR...; IB...
(Variant: … LX, with low NOx emissions)
respect the minimal regulation of the European Directives:
• 2009/142/EC (G.A.D)
• 2004/108/EC (E.M.C.)
• 2006/95/EC (L.V.D)
• 2006/42/EC (M.D.)
and have been designed and tested in accordance with the European Standards:
• EN 676 (gas and dual fuel, gas side)
• EN 267 (light oil and dual fuel, oil side)
Cento, 23 July 2013
CE0085:
DVGW CERT GmbH, Josef-Wirmer Strasse 1-3 – 53123 Bonn (D)
Statement of Conformity
CEO and General Manager
Dr. Riccardo Fava
R&D Manager
Eng. Paolo Bolognin
!
WARNINGS / NOTES
i
INFORMATION
E
DANGER / CAUTION
TECHNICAL SPECIFICATIONS .......................................................................................................................................................................................
4
CONNECTING THE BURNER TO THE BOILER .............................................................................................................................................................
7
ASSEMBLING THE GAS TRAIN ......................................................................................................................................................................................
7
GAS SUPPLY LINE ..........................................................................................................................................................................................................
8
ELECTRICAL CONNECTIONS
........................................................................................................................................................................................
9
DESCRIPTION OF TWO-
STAGE
PROGRESSIVE OPERATION ...................................................................................................................................
10
NATURAL GAS IGNITION AND ADJUSTMENT ..............................................................................................................................................................
11
IONISATION CURRENT MEASUREMENT
...................................................................................................................................................................... 12
ADJUSTING THE AIR ON THE COMBUSTION HEAD ................................................................................................................................................... 13
MAINTENANCE
...............................................................................................................................................................................................................
14
PREPARATION FOR CONNECTION WITH TRAIN TURNED UPWARDS .....................................................................................................................
15
REDUCERS ASSEMBLY INSTRUCTIONS FOR LPG .....................................................................................................................................................
16
HOW TO FIND THE CAUSES OF IMPROPER OPERATION OF TWO-STAGE GAS BURNERS AND HOW TO RECTIFY THEM .............................
17
WIRING DIAGRAM TBG 45 ME / 60 ME .........................................................................................................................................................................
18
Содержание TBG 45 ME
Страница 2: ......
Страница 20: ...18 22 0006081533_201403 ENGLISH WIRING DIAGRAM TBG 45 ME 60 ME ...
Страница 21: ...19 22 0006081533_201403 ENGLISH MINIMUM IONISATION CURRENT 1 4 µA ...
Страница 24: ...22 22 0006081533_201403 ...
Страница 42: ...18 22 0006081533_201403 ESPAÑOL DIAGRAMA ELÉCTRICO TBG 45 ME 60 ME ...
Страница 43: ...19 22 0006081533_201403 ESPAÑOL CORRIENTE MÍNIMA DE IONIZACIÓN 1 4 µA ...
Страница 46: ...22 22 0006081533_201403 ...
Страница 64: ...18 22 0006081533_201403 FRANÇAIS SCHEMA ELECTRIQUE TBG 45 ME 60 ME ...
Страница 65: ...19 22 0006081533_201403 FRANÇAIS COURANT D IONISATION MINIMUM 1 4 µA ...
Страница 68: ...22 22 0006081533_201403 ...
Страница 86: ...18 22 0006081533_201403 TÜRKÇE ELEKTRİK ŞEMASI TBG 45 ME 60 ME ...
Страница 87: ...19 22 0006081533_201403 TÜRKÇE MİNİMUM İYONİZASYON AKIMI 1 4 µA ...
Страница 90: ...22 22 0006081533_201403 ...
Страница 108: ...18 22 0006081533_201403 PYCCKИИ ЭЛЕКТРИЧЕСКАЯ СХЕМА TBG 45 ME 60 ME ...
Страница 109: ...19 22 0006081533_201403 PYCCKИИ МИНИМАЛЬНЫЙ ТОК ИОНИЗАЦИИ 1 4 µA ...
Страница 112: ...22 22 0006081533_201403 ...
Страница 130: ...18 22 0006081533_201403 中 文 电气连接 TBG 45 ME 60 ME ...
Страница 131: ...19 22 0006081533_201403 中 文 最小电离电流是1 4µA ...
Страница 132: ...20 22 0006081533_201403 中 文 水温 压力电极 继电器控制输入 控制输入 0 4 20mA 外部温 度探头 燃气温 度探头 可能 控制输入 0 10 V ...
Страница 134: ...22 22 0006081533_201403 ...
Страница 135: ......