20
HYDRAULIC CONNECTIONS (LIGHT OIL)
The connection pipes between tank and burner must be completely tight.
We suggest to use copper or steel pipes of an adequate diameter (see list and drawing).
At the rigid pipes ands it must be fitted the fuel’s detection gates.
Filters, flex pipes and relative connection couplings are supplied along with burner.
Pump is equipped with suitable connecting points (see drawing) for detection instruments (pressure gauge and
vacuummeter).
Pressure drop in suction must not exceed 4 m. W.C. = to 35 cm.Hg. for a proper and silent operation.
Probable max. pressure on suction and on the return 1,5 bar.
HYDRAULIC DIAGRAM
N° BT 8502
DETAILS OF SUNTEC AP 57 C 7545 PUMP
1
- Electrovalve (normally open)
2
- Pressure test point and purge point (Ø 1/8”)
3
- High pressure regulator (2nd stage) 16 bar
4
- Return
5
- Suction
6
- Delivery
7
- Vacuum test point (Ø 1/8”)
8
- Low pressure regulator (1st stage) 8 bar
Foot valve
Light oil electrovalve
Nozzle
Pump with two pressure regulators
1st flame = 8 bar - 2nd flame = 16 bar
Return
Suction
N° 0002900660
Light oil electrovalve
1st flame
Содержание COMIST 23SP
Страница 26: ...25 GAS BURNERS CONTROLS LGB for small to medium capacity burners with or without a fan intermittent operation ...
Страница 27: ...26 GAS BURNERS CONTROLS LGB for small to medium capacity burners with or without a fan intermittent operation ...
Страница 29: ...28 GENERAL DIAGRAM FOR TWO STAGE L P G PRESSURE REDUCTION FOR BURNER OR BOILER N BT 8721 2GB Rev 21 03 90 ...
Страница 36: ...35 ...
Страница 37: ...36 ...
Страница 47: ......
Страница 48: ......