47
N° 8875-GB
Rev. 06/11/90
The MVD gas valves open and close rapidly.
To regulate the gas flow, unscrew and remove cap “A” and
loosen nut “B”.
Then, using a screwdriver turn screw “C”. Unscrewing it
increases the gas flow, tightening it decreases the flow.
After regulating, lock nut “B” in place and reposition cap
“A”.
HOW THE VALVE FUNCTIONS mod. MVDLE
The gas valve has a rapid initial trip (opening can be
adjusted from 0 to 40% using pin “G”). Full opening from
that point on takes place slowly over approximately 10
seconds.
N.B. There will not be sufficient supply for ignition if the
flow feed device “E” is set at its minimum position.
Therefore, it is essential to open the maximum flow
rate control device “E” sufficiently to ensure ignition.
Setting the initial rapid release trip
To set the initial rapid release, unscrew the protection
cap “F” and use the back of this cap as a tool to turn pin
“G”.
Turning clockwise decreases the gas flow, turning counter-
clockwise increases it.
This done, return cap “F” to its original position.
Setting maximum gas flow
To adjust the gas flow rate, loosen screw “D” and turn
knob “E”. Turning clockwise decreases the gas flow,
turning counter-clockwise increases it.
This done, tighten screw “D”.
INSTRUCTIONS FOR SETTING DUNGS GAS
VALVES mod. MVD ... and MVDLE ...
Mod. MVDLE....
Mod. MVD....
8875.tif
H
= Identification plate
I
= Flow direction indicator
D = Identification plate
E = Flow direction indicator