SIPHON FEED SYSTEM WITH FEED FROM THE TOP OF THE TANK
SUCTION FEED SYSTEM
GRAVITY FEED SYSTEM
H
Total length meters
meters
Ø = 3/4" Øi. 20 mm
0,5
34
34
1
29
29
1,5
24
24
2
19
19
2,5
14
14
3
9
9
3,5
3,5
3,5
H
Total length meters
meters
Ø = 3/4" Øi. 20 mm
1
40
40
1,5
45
45
2
45
45
2,5
50
50
3
50
50
H
Total length meters
meters
Ø = 3/4" Øi. 20 mm
1
40
40
1,5
45
45
2
45
45
2,5
50
50
3
50
50
TABLE OF PIPELINE FOR BT 300 DSG-4T
Dimension P = 3,5 m. (max.)
H - Height difference between minimum fuel tank level and pump axis.
L - Total length of pipeline, including vertical lenght. Subtract 0,25 mt.
for every elbow or gate valve.
N.B. Comply with existing regulations regarding apparatus
required in the pipeline system
1 Tank
2 Feeding pipe
3 Wire-net filter
4 Pump
5 Degasifier
6 Suction pipe
7 Return pipe
8 Automatic fuel interception
device at burner shut off
9 Non-return valve
Pump axis
Pump axis
1 Tank
3 Wire-net filter
4 Pump
6 Suction pipe
7 Return pipe
8 Automatic fuel interception device
at burner shut off
9 One-way valve
10 Bottom valve
Pump axis
1 Tank
3 Wire-net filter
4 Pump
6 Suction pipe
7 Return pipe
10 Bottom valve