FXV3/CXVT Rigging & Assembly Instructions
–
Forward
Page | 2
IMPORTANT NOTICE
FXV3/CXVT should be rigged and assembled as
outlined in this bulletin.
These procedures should be thoroughly reviewed prior to the rigging
and assembly of the equipment to acquaint all personnel with
procedures to be followed and to ensure that all necessary
equipment is available beforehand.
Be sure to have a copy of the submittal package
available for reference. If you do not have a copy of this
drawing, or if you need additional information about
this unit, contact your local
whose name and telephone number are on a label
adjacent to the access door. The model number and
serial number of the unit are also located in this area.