Section 1
General Information
Receiving & Installation 3-11
MN715
Control Transformer
Tap Change Procedure (size G controls).
1.
Be sure drive operation is terminated and control is disabled.
2.
Remove all power sources from the control. If power has been applied, wait at
least 5 minutes for bus capacitors to discharge.
3.
Remove or open the front cover and locate the control transformer (Figure 3-4).
4.
Remove the wires from the two right side terminals.
5.
Place the wires on the center terminals as shown.
6.
Install or close the front cover.
Figure 3-4 Configuring the Control Transformer Terminal Block for 380 - 400VAC (Size G)
460VAC
380 - 400VAC
3 Phase Installation
The AC power and motor connections are shown in Figure 3-5.
Figure 3-5 3 Phase AC Power Connections
L1
L2
L3
Alternate *
Fuse
Connection
Note 1
L1
L2
L3
L1
L2
L3
* Circuit
Breaker
Earth
*
Optional components not provided with control.
Note 3
Baldor
Series 15H
Control
*Optional
Line
Reactor
Note 1
Note 3
A1
B1
C1
A2
B2
C2
A1
B1
C1
Note 4
Notes:
1.
See “Protective Devices” described previously in this section.
2.
Use same gauge wire for Earth ground as is used for L1, L2 and L3.
3.
Metal conduit should be used. Connect conduits so the use of a
Reactor or RC Device does not interrupt EMI/RFI shielding.
4.
See Line/Load Reactors described previously in this section.
Note 2
See Recommended Tightening Torques in Section 6.
Содержание -W
Страница 1: ...SERIES 15H Inverter Control Installation Operating Manual 2 01 MN715 ADJUSTABLE SPEED DRIVE ...
Страница 51: ...3 40 Receiving Installation MN715 ...
Страница 128: ...Appendix C Appendix C 1 MN715 ...
Страница 131: ...MN715 Series 15H Inverter Control ...