Bakers Pride Cyclone CO11-E1 Скачать руководство пользователя страница 4

4

 

2.   CO11-2E: Installation / Mounting 6” Legs

a. After unpacking the unit, remove legs and any other material from inside the oven.
b.   Tilt the bottom oven onto its left side and attach the two mounting plates to the right underside 

using ½” bolts and washers and tighten firmly. Screw the 6” legs into the center holes.                       

c.   Use proper lifting equipment to raise the unit, and while suspended attach the two left mounting 

plates and legs in the same manner.

     

d.  Use the lifting equipment to raise the top oven to the proper height, and slide it on top of the 

bottom oven. Line up the sides and front and use the supplied stacking brackets, screws and 
lock washers to fasten the two ovens in the back.                   

3.

    

CO11-E1: Assembly Of An Open Rack Stand (see Sketch “D”)

a. Slightly loosen the (12) 30” leg bolts.
b. Remove (4) inner bolts, (1) from each of the four legs, place the top right angle underneath as 

shown, and tighten these (4) bolts.

c. Insert Open Rack Shelf and tighten into place with (8) 3/8”-16 screws, washers and nuts.
d. Position Rack Supports and tighten in place using (4) 5/16”-18 hex nuts and flat washers.

4.    COC-E / CO11-E1: Installation Of Casters (Optional)

a. (4) Casters (2) with wheel brakes and the mounting hardware is packed and included in the 

shipment if ordered.

b. Install casters with wheel brakes on the front of the unit. 

Note:

 See page 9, sketch D.

c. Install rear legs with casters on the back of the unit with the restraining plate affixed firmly 

between the right rear leg & the bottom of the appliance as shown on page 9.

d. Provide a suitable restraining chain or cable to securely tether the appliance to the building 

structure. The restraining chain or cable should be of such length, that it will stop movement of 
the appliance before there is any strain on the power supply cable.

4. ELECTRICAL CONNECTIONS

1. General Instructions

a. A licensed electrician must make electrical connections.
b. When installed, unit must be electrically grounded in accordance with the local codes and/or the 

latest edition of the National Electrical Code ANSI/NFPA No. 70 in USA or Canadian Electrical 
Code, CSA Standard C22.1, Part 1 in Canada.

c. Make sure electrical supply corresponds with that specified on the rating plate.
d. For  single  phase  2-wire  or  three  phase  3-wire  supplies,  the  controlling  branch  circuit  is 

designed to operate at 208-240 volts AC and is pre-wired at the factory between L1 and L2 of 
the field wiring terminal block (in North America).

e. For  three  phase  4-wire  230/400  Volts  AC  50hz  supplies,  the  controlling  branch  circuit  is 

designed to operate at 230 volts AC and is pre-wired at the factory between L2 and N of the field 
wiring terminal block.

f.

Only use copper conductors rated at 90°C.

g. All pole disconnect must be provided by the installer.
h. FOR CE UNITS: The appliance must be connected by an earthing cable to all other units in the 

complete installation and thence to an independent earth connection in compliance with EN 
60335-1 and/or local codes. If flexible line cordage is used to connect the equipment, it should 
be a minimum of H07RN-F type conforming to EN60335-1, EN60335-2-42 and/or local codes.

Power Supply

KW

L1 (amp) L3 (amp) L2 (amp) N (amp)

KW

L1 (amp) L3 (amp) L2 (amp) N (amp)

9.5

45.7

45.7

208 (1)

10.5

50.5

50.5

9.5

27.0

25.0

27.0

208 (3)

10.5

30.0

27.8

30.0

8.7 - 10.3 39.5 - 43.0

39.5 - 43.0

220-240 (1)

9.6 - 11.4 43.7 - 47.6

43.7 - 47.6

8.7 - 10.3 23.4 - 25.5 21.6 - 23.6 23.4 - 25.5

220-240 (3)

9.6 - 11.4 25.8 - 28.2 24.0 - 26.2 25.8 - 28.2

9.5

41.3

41.3

400-Y (1)

10.5

45.7

45.7

9.5

13.0

15.2

13.0

2.2

400-Y (3)

10.5

14.5

16.7

14.5

2.2

COC-E  Power and Current per Deck

CO11-E  Power and Current per Deck

Volts (Phase)

NOTE:  EACH  OVEN  REQUIRES  A  SEPARATE  CONNECTION !

Содержание Cyclone CO11-E1

Страница 1: ...alteration service or maintenance can cause property damage injury or death Read the Installation Operating and Maintenance Instructions thoroughly before installing or servicing this equipment FOR YO...

Страница 2: ...2 d COC E CO11 E 230 400V CE w FAST Temperature Controller E 6 13 6 Parts Lists w Exploded Views 14 a CO11 E 14 b COC E 17 7 Warranty 20 2 INSTALLATION INSTRUCTIONS 1 RECEIVING Read the notice on the...

Страница 3: ...ed mounted to unit The legs are packed inside the unit with the wire shelves b After unpacking the unit remove legs and any other material from inside the oven c Place the unit on a counter or other f...

Страница 4: ...there is any strain on the power supply cable 4 ELECTRICAL CONNECTIONS 1 General Instructions a Alicensed electrician must make electrical connections b When installed unit must be electrically groun...

Страница 5: ...sea and dizziness Be sure the oven is placed in a well ventilated area 6 SYSTEM CHECK ROTARYCONTROL a Open the oven door s b Turn selector switch to high The green indicator light near the selector sw...

Страница 6: ...a Close the oven door s b Turn selector switch to High or Low position The green indicator light near the selector switch will be illuminated c Turn the thermostat knob to the desired cooking tempera...

Страница 7: ...ers Pride Software for Cyclone Series Convection Ovens supplied with this option e Load the oven with the product to be cooked f Turn the timer knob to the desired bake time and timer will begin count...

Страница 8: ...or product residue from stainless steel use ordinary soap and water with or without detergent applied with a sponge or cloth Dry thoroughly with a clean cloth Never use vinegar or corrosive cleaner D...

Страница 9: ...uld only be performed by a factory authorized technician 7 Call the factory toll free number 800 431 2745 for the name of an authorized service location in your area 8 Replacement parts manual sent wi...

Страница 10: ...LEMENTS AMBER PILOT LIGHT THERMOSTAT 250V LIGHTS 28 BRN 28 BRN 26 WHT 27 WHT 25 BRN 24 BLK 23 BLK 7 WHT 8 BRN 4 BRN 5 BLK 16 WHT A1 H1 H2 STEAM OPTION A2 WHT A1 BLK 29 BLK 31 BLK H2 H1 POTENTIOMETER T...

Страница 11: ...WIRES NOTES SENSOR WHT RED GC20 3006 HEATING ELEMENTS AMBER PILOT LIGHT THERMOSTAT 250V LIGHTS 28 BRN 28 BRN 26 BLK 27 WHT 25 BLU 24 BLU 23 BLU 7 BRN 8 WHT 4 BLK 5 BLU 16 BRN A1 H1 H2 STEAM OPTION A2...

Страница 12: ...EAT INDICATOR SINGLE PHASE TB1 X E Y Z TERMINAL BLOCK 2 L1 L2 TIMER L2 PRESENT ONCO11 ONLY STEAM SWITCH TIMER POTENTIOMETER TIMER STEAM OPTION BLU RED YEL BLK WATER SOLENOID VALVE 4 1 5 2 3 6 LIGHT SW...

Страница 13: ...2 S1 13 C2 14 15 A5 C2 7 S1 13 4 34 32 31 16 18 S2 A6 H6 15 ROTARY SWITCH 15 33 1 2 3 POWER INDICATOR HEAT INDICATOR SINGLE PHASE TB1 X E Y Z TERMINAL BLOCK 2 L1 L2 TIMER L2 PRESENT ONCO11 ONLY STEAM...

Страница 14: ...E D R P I E D w S r i o tc o h D w S r i o tc o h D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 40 44 43 41 38 39 42 45 46 47 48 50 49 51 52...

Страница 15: ...affle Plate 68 M1176X Potentiometer 23 Q2009A Thumb Screw 1 4 20x1 2 4 69 M1335X Bell Audiolarm 24 E3095X Baffle Plate Bracket Assy 4 70 S1311X Knob 3 25 Q1414A Screw Hex Hd 10x3 4 8 71 M1352X P1166A...

Страница 16: ...oller Chain 35 Chain Connection Link 41 Turnbuckle 1 4 20x3 1 4 20 Hex Nut Left Hand Thread 2 30 Leg Set of 4 Leg Bolt Set For 4 Legs 24 1 2 S S Leg Set 4 Used w Casters 24 1 2 S S Leg each Used w Cas...

Страница 17: ...Dn ow Dn Up Up e c S e t l e c S e t l nu Men u Me ar St t ar St t t S op t S op ow Dn ow Dn He at g in He at g in t S ea m t S ea m 2 2 2 3 1 4 5 6 7 8 9 10 11 12 13 14 12 13 14 15 16 17 18 19 21 20...

Страница 18: ...er 10 18 T3042A Rack Support 2 61 Q1402A Nut 10 32 12 19 K1088K Horizontal Seal Strip 2 62 S1062X Terminal Cap 6 20 K1089K Vertical Seal Strip 2 63 Q1408X Nut 10 24 6 21 S6037X Door Gasket 64 Q1436A B...

Страница 19: ...2 22 E3210U Contactor Bracket 6 M1217X Motor 1 4HP 2 Spd 200 230V 50 60 23 E1018K Terminal Box 7 Q3014A Lockwasher Split 5 16 4 24 Q1407A Bolt Hx Hd 10x1 2 2 8 Q2204A Nut HX 5 16 18 4 25 E1176K Cable...

Страница 20: ...riod of THREE MONTHS The installation of these replacement decks is the responsibility of the purchaser The extended Cyclone door warranty years 3 through 5 is a parts only warranty and does not inclu...

Отзывы: